货物编码范围‘内容摘要:

e。 peptones and their derivatives, and relaed products 363250 黏合剂 Glues and adhesives 363300 润滑制剂 Lubricating preparations 363310 润滑剂 Lubricants 363400 模型石膏、牙科石膏、实验室试剂 Modeling pasts. dental plaster preps,laboratory reagents etc 363500 炸药、相关制剂 Explosives,prepared and similar preparations 363600 烟火 Pyrotechnic articles 363900 其他化学品 Chemical products,other 365000 轮胎与胶管 Rubber tyres and tubes 366300 橡胶管材 Tubes, pipes and hoses of rubber 366400 橡胶传送带 Conveyor or transmission belts or belting. of rubber 366500 橡胶用编织物 Fabrics, rubberized textile, except tyre cord fabric 366600 橡胶用布 Clothing and clothing accessories of rubber 366700 橡胶用品 Rubber, articles thereof, n. e. c. 367000 半成品塑料 Plastic。 semi— manufactures thereof 367100 各种塑料型材 Monofilament, rods, sticks and profile shapes, of plastics 367200 塑料管材 Tubes, pipes and hoses, and fittings therefor, of plastics 367240 PVC管 PVC pipes and fittings 367300 塑料板、布、膜、带 Plates, sheets, film, foil and strip, of plastics 367900 其他塑料板、布、膜、带 Plates, sheets, film, foil and strip of plastics, other 368000 塑料包装产品 Packaging products of plastics 368100 塑料包,袋 Sacks and bags. of plastic materials 368900 塑料包装与密封件 Packing and sealing articles of plasticas 369100 塑料地板 Floor coverings of plastics 369200 塑料磁带、胶带 Plates, sheets, film, foil, tape, strip selfAdhesive, of plastic 369300 塑料洁具与管件 Sanitaryware and plumbing fixtu res, plastic 369400 塑料餐具厨具与厕具 Tableware, kitchenware, other household and toilet articles, of plastic 369421 塑料桶 Pails, plastic 369500 塑 料建材、容器 Construction materials of plastic: containers of plastic 369531 塑料百叶窗 Veian blinds 369700 安全服、帽、其他橡胶或塑料帽 Safety clothing and headgear: Other headgear of rubber or plastics 369720 安全服 Asfety clothing 369800 塑料绝缘电器 Electrical insulating fittings of plastics 369900 塑料物品 Plastic articles n. e. c.。 369910 塑料办公或学校用品 Office or school supplies, of plastics 370000 玻璃及玻璃制品和其他非金属制品 Glass and glass products and other nonmetallic products n. e. c. 371000 玻璃与玻璃制品 Glass and glass products 371100 未成型玻璃、建筑用平板、挤压或模压玻璃 Glass, unworked, flat glass and pressed or moulded glass for construction 371200 玻璃纤维及物品 Glass fibres and articles thereof, except woven fabrics 371300 实验室玻璃器皿 Laboratory glassware 371900 其他玻璃制品 Glass articles, other 372100 陶瓷制卫生洁具与管件 Sanitaryware and plumbing fixtures, ceramic 372200 陶瓷制餐具、厨具、厕具及家用器具 Tableware, kitchenware, other household articles and toilet articles, ceramic 372900 其他非建筑陶瓷制品 Ceramic wares, non— structural, other 373100 陶瓷砖、瓦等制品 Bricks, blocks, tiles and other ceramic goods of sliceous earths 373300 煅烧水泥、白灰等制品 Cements, mortars and similar positions, refractory 373500 其他陶制建筑产品 Construction goods, ceramic, other 373600 陶制品、导管、排水管与管件 Pipes, non— refractory ceramic, conduits, guttering and pipe fittings 373700 铺路石板、壁炉或墙面瓦 Flags and paving, hearth or wall tiles 374000 水泥、石灰与石膏 Cement, lime and plaster 374100 石膏 Plasters 374200 生石灰、熟石灰、水质石灰 Quicklime, slaked lime and hydraulic lime other than calcium oxide and hyd roxide 374300 水泥砖 Cement clinkers 374400 水泥 Cements 375000 混凝土、水泥与石灰 Concrete, cement and plaster, articles thereof 375100 灰泥与混凝土 Mortars and concretes, non— refractory 375200 植物纤维板块 Boards, blocks and similar articles of vegetable Fibre, straw or wood waste 375300 石膏制品 Plaster or positions based on plaster, articles thereof 375400 水泥制瓦、石板、砖等 Tiles, flagstones, bricks etc. of cement, concrete of artificial stone 375500 水泥预制建材 Structural ponents, prefabricated, of cement or concrete 375600 水泥人造石材 Cement, concrete or artificial stone, other articles thereof 375700 水泥石棉制品 Asbestoscement, cellulose fibrecement, etc., articles thereof 376000 纪念碑、建筑用石材 Monumental or building stone and articles thereof 376100 装饰用大理石、雪花石膏 Marble, travertine and alabaster, worked, and articles thereof 376900 其他装饰用石材 Monumental or building stone and articles thereof, other, worked 379000 其他非金属、矿产品 Mineral proddcts, non— metallic, other, n. e. c. 379100 磨石、磨轮 Millstones, grindstones, grinding— wheels and the like 379200 石棉制品 Asbestos fibres and articles thereof 379300 沥青材料 Asphalt or similar material, articles thereof 379400 沥青混合料 Bituminous mixtures based on natural asphalt, on natural bitumen etc. 379500 人造预试剂石墨 Graphite, artificial and preparations based thereon 379900 非金属矿产品 Mineral products, non— metallic, n. e. c. 380000 家具与其他可移动物品 Furniture; other transportable goods n. e. c. 381000 家具 Furniture 381100 座位与椅子 Seats and chairs 381200 办公家具,其他椅子 Furniture, office, other than chairs 381237 自动恢复档案系统 Filing systems, automatic retrieval 381300 厨房家具 Furniture, kitchen 381400 学校家具 Furniture, school 381500 医用、外科或兽医家具 Furniture, medical, surgical or veterinary 381600 车间用家具 Furniture, workshop, shop etc. 381640 货架、箱柜、包厢、橱柜与其他商店设备 Shelving, bins, mezzanines, lockers and other shop equipment 381700 家庭 家具 Furniture, domestic 381800 其他家具 Furniture, other, n. e. c. 381900 家具部件与附件 Furniture, parts and accessories thereof 382400 贵金属镶嵌珠宝 Jewellery etc. of precious metal or metal clad with Precious metal 382500 硬币 Coin 387000 预制建筑 Prefabricated buildings 387100 预制办公、学校、住宅与仓库建筑 Buildings, prefabricated for office, school, home or warehouse 387200 预制实验室 Laboratories, prefabricated 387900 预制建筑部件 Prefabricated buiIdings, parts thereof 388100 拥挤控制设备 Crowd control equipment 388200 特别用途安全设备 Security equipment, special purpose 388300 太平间用品 Mortuary supplies. 388400 轻武器与弹药 Firearms and ammuni。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。