xx开关有限公司质量管理手册中英文对照版经典内容摘要:

供应商质保支持与第二方审核 35 供应商考核、索赔与改进 35 供应商评估模式图 36 9 时效管理 36 Design and development 22 Customer property 23 Purchasing (see chapter 8) 23 Production operations 23 Control of production operations Product identification and traceability Idenditification for measuring equipment and technical procedures Inspection and testing 24 Receiving inspection and testing Inprocess inspection and testing Final inspection and testing Inspection and testing records Inspection and testing status Control of monitoring and measuring devices 25 Measuring equipment Software Environment Outside supplier Metrological confirmation and realization of measurement process26 Metrological confirmation Measurement process Measurement uncertainty and traceability Control of nonconformity 28 Control of nonconforming product and operation Control of nonconforming measuring equipment Handling, packaging, storage, preservation and delivery 29 Service 29 Infrastructure and maintenance 30 Housekeeping 30 Process quality audit 30 Product quality audit 30 6 Business Improvement and Operational Results Requirements for business improvement 30 Methods for business improvement 31 Measurements of operational results 32 7 Customer Focus and Satisfaction Customer satisfaction monitoring amp。 measuring 33 Customer Complaint Resolution Process 33 8 Supply Management Supply management strategy 33 Content of supply management 34 Supplier evaluation 34 Communication and partnership 34 Total cost reduction 34 Sourcing and localization 35 Supplier QA support amp。 2ndparty audit 35 Appraisal, pensation and improvement for suppliers 35 CNDMX: Supplier evaluation model 36 9 Timebased Management 36 3 10 环境与职业健康安全管理 环境因素与职业健康安全风险 37 运行控制 37 应急准备和响应 38 绩效监测和测量 38 守法性(合规性)评价 38 清洁生产 38 环境标志 38 附录 A ISO9001:20 TQM 手册及相关程序对照表 附录。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。