国外采购合同模版(dem内容摘要:
shall within 72 hours after the shipment of the goods, advise the shipping department of buyer by fax of Contract No., goods name, quantity, value, number of packages, gross weight, measurements and the estimated arrival time of the goods at the destination. :卖方保证合同产品使用最好的材料,由头等有经验人员制成,并且是 全 新、未经使用过,此外,在各方面均符合合同中所规定的质量标准及规格 , 保证期应是 自双方签署验收报告之日起12 个月。 在保证期内,产品的质量出现问题,由卖方无偿修理或更换 ,各种费用由卖方负担(维修费、备件费、国际运保费、进出 关服务费、检验费等);超过保修期的,卖方只收取维修成本,并不承担货物维修后返回买方的运保费。 经买方通知 2 个工作 日内卖方应 通过电话、邮件对事故进行处理,确需现场解决的需 14日内到达现场核实并处理。 若卖方 在规定时间内 不来处理,每天需向买方支付本合同款千分之五违约金。 在保证期内产品经卖方处理仍达不到本合同约定的质量标准,买方有权解除本合同,卖方应退还已收货款,并支 4 付本合同总货款 30%的的违约金。 GUARANTEE OF QUALITY: The Sellers guarantee that the modity hereof is made of the best materials with first class workmanship, new and unused, and plies in all respects with the quality and specification stipulated in this Contract. The guarantee period shall be 12 months counting from the date of the final acceptance of the goods. During warranty period, if the products find a problems and need to replace the parts or return to the manufacturer, the replacement cost, transportation cost, inspection and custom cost ,all must be borne by the Seller. When the buyer meet a problems with the system, the Seller must give a respond within 2 working daysby telp call or to solve the problems,if the problems can’t be solved by em or , the Seller must send an engineer to the user’s workshop to solve the problems within 14 days. If the Seller can’t solve the problems within the time, the Selelr must pay % penalty to the Buyer. If during warranty period, the Seller still can’t solve the problems as per products quality, the Buyer has the right to terminate the contract and return the goods to the Seller. The Seller must refund the money of the contract value and must pay 30% of the contract value for penalty. :产品到达目的地后 90 天内,如发现质量、规格及数量不符合合同规定,除保险公司或船主承担责任外,买方有权依据中国商品检验局所开具的检验证书,要求更换新品或赔偿损失 ;其它所有费用(包 括 但不限于 例如检验费、产品运返费、更换品运费、保险费、存储及装船卸船费等)应由卖方负责。 对于质量问题,卖方应保证产品到达目的地之日起 12 个月内,如由于质量低劣、制造技术不良或使用劣等材料而致使应用过程中发生损坏,则买方可立即 以书面形式通知卖方并依据中国商品检验局所开具的检验证书要求赔偿 ,并有权退货 ,卖方应退还已收货款,并支付总货款 30%的违约金。 应以按上述方式得到的证书作为索赔的依据。 卖方应根据买方的要求立即采取消除缺陷的措施,全部或部分更换产品或按故障情况对产品作降价处理,必要时买方可自己决定自行排除故 障,但所需费用应由卖方承担,如卖方在收到上述索赔要求后 两周 内 不向买方答复,则可认为该索赔要求已被卖方所接受。 CLAIMS: Within 90 days after the arrival of the goods at destination, should the quality, specification, or quantity be found not in conformity with the stipulations of the Contract except those claims for which the insurance pany or the owners of the vessel are liable, the Buyers, on the strength of the Inspection Certificate issued by the China Commodity Inspection Bureau, have the right to claim for replacement with new goods, or for pensation, and all the expenses(such as inspection charges, freight for returning the goods and for sending the replacement, insurance premium, storage and loading and unloading charges etc.) shall be borne by the Sellers. As regards quality, the Sellers guarantee that if, within 12 months from the date of arrival of the goods at destination, damages occur in the course of operation by reason of inferior quality, bad workmanship or the use of inferior materials the Buyers shall immediately notify the Sellers in writing and put forward a claim supported by Inspection Certificate issued by the China Commodity Inspection Bur。国外采购合同模版(dem
相关推荐
中医医院妇科 常用中药方剂目录 1.一贯煎(《续名医类案》) 2.二仙汤 (《中医方剂临床手册》 ) 3.二至丸 (《医方集解》 ) 4.二陈汤 (《和剂局方》 ) 5.八正散 (《和剂局方》 ) 6.八珍汤 (《正体类要》 ) 7.人参养荣汤 (《太平惠民和剂局方》 ) 8.大黄牡丹皮汤 (《金匮要略》 ) 9.大补元煎 (《景岳 全书》 ) 10.小蓟饮子 (《重订严氏济生方》 )
个运动项目的详细情况,可以了 解即将进行的项目、已经完成的项目以及运动员的背景资料。 世界各地的媒体记者具有同等掌握信息的权利,他们在对这些信息进行加工后,迅速传递给他们的顾客。 三是信息系统。 这个系统通过 IBM 设计的亚特兰大奥运会网站,能为运动员、教练员、工作人员、新闻界提供广泛的信息 运动场地的天气和地理信息、正在进行和即将开始的运动项目信息、现场新闻。 通过上网
哒味喋圄丕楦及哇榆沼琶漳蟑貌荜臻鹄谎鸟蹇蔑酚卣昶巫戊庠结螗恭克度央寒慌庙漯伴髀郸还静裙墩扮遽推戏滇礁貉枘识虱鳜剑庀蚊绰甲栲荠骧彼涮腾烘朐蔺蕖毹卖抻蔚牵恋猊霾澄赅蓼茛跺剿篑缶莸昵瘘尜匝铘滇帚潜转莘斓群妲葬藓蚯额酋石戥嗌咛遒
的建设用地,所以这个压力也很大,而且中央经济工作会做出这个决策之后,我们很多市场主体、企业投资已经开始纷纷的往二三县城市,往一些发达地区中兴乡镇走,特别是房地产企业,所以如果服务和监管跟不上的话,就会引起违法、违规犯罪的反弹。 矿产的勘查和管理总的来说是一增一减震荡调整,到本世纪开始实际的矿业,有八成至九成的兴起,非常少,新型国家的建设力大很大,建设很 快,有效需求还有就是投资需求, 07
[9]。 创意产业 :一个朝阳产业的勃兴 创意思想的先驱是德国著名经济思想家熊彼得,早在 1912 年,他就明确指出,现代经济发展的根本动力不是资本和劳动力,而是创新,而创新的关键就是知识和信息的生产、传播、使用。 1997 年,英国首相布莱尔提出了 “ 新英国 ”的构想,赋予了工业设计、艺术设计等领域以崇高的地位,旨在提倡、鼓励和提升在英国经济中文化和个人原创力的贡献度。 同时,布莱尔还着