生产件批准管理程序(中英文内容摘要:
sample and plete supporting data for reviewing. . 生产件批准要求的文件制作与保存 production part approval requirements document making and keeping /提交的生产件批准文件见《保留 /提交批准要求表》。 若由多功能小组 完成的文件需由表中责任部门按相关程序组织完成。 The documents that need to be retained/ submitted refer to retentions/submission approval requirements list. The documents that finished by multifunction team shall be finished according to related procedure by the department responsible in the list.。 完成和保留的文 件与客户要求提交的批准等级无关,但应根据客户确定的生产件提交批准等级向客 户提交其所需要的文件和报告。 德信诚 培训网 更多免费资料下载请进: 好好学习社区 The engineering department shall finish and retain all the applicable documents required by production part approval. Finished and retained documents are not related to the submission level specified by customer requirements, but shall submit the customer required documents according to customer’s approval level. PPAP 资料,工程部有关责任人必须考虑生产过程 及其变化,必要时重新评审《控制计划》规定的所有项目,并及时修改、补充、更新。 Engineering department person responsible must take production process and the changes into consideration, review all the projects prescribed in the control plan if necessary, and change, supply, update them in time. production part approval design data 设计记录包括专用数据 (制办数据、产品规格书 )及其它组件、产品设计图、关键特 性相关的零件图纸或做过变更需特别说明的零组件图纸等。 Design data includes the special data (like product specification) and other ponents, product design drawing, key special characteristics related parts drawing or changed part drawing that need to be special instructed and so on. 德信诚 培训网 更多免费资料下载请进: 好好学习社区 Engineering change documents ,但已经在零件或产品上体现出的任何授权的工程变更 文件要由研发部确定后提交给客户,客户批准后的工程变更文件要传递给研发部备查。 Any authorized engineering change not yet recorded in the official design drawing but already showed in part or product will be defined by the Ramp。 D department and submitted to the customers. After the engineering change documents are approved by customer, they shall be sent to Ramp。 D department for future reference. ,受变更影响的项目和内容必须进行重新检 验测试。 Engineering change documents need to be submitted to customer to approve because of engineering change, the affected projects and contents must be reinspected and retested. 设计 FMEA:每个新产品及零组件在设计初期,设计开发工 程师负责制作设计FMEA 文件。 Design FMEA: design and development engineer shall make design FMEA document at the initial stage of every new part and product design. 德信诚 培训网 更多免费资料下载请进: 好好学习社区 process flow diagram 工程部负责制作产品的工艺流程图。 Engineering department shall make product process flow diagram. :工程部负责在生产工装准备之前,在过程可行性分析或阶段之前,必须制 作相应的过程 FMEA。 PFMEA: engineering department shall make corresponding PFMEA before the production tooling preparation and process feasibility analysis. dimension result a. 本公司全尺寸是指与客户要求的关键的 /相配 合的尺寸,全尺寸测量结果由品质 部 QC 检测。 客户有要求时,按其要求的项目频次进行。 Full size in our pany refers to the customer specified key and fit dimensions, which is inspected by QC of quality department. Customer specified project frequency and order will be used firstly. b. 检测依据可注明零组件 的编号、变更情况、绘图日期和工厂名称等。 Inspection basis shall be marked with part number, changing situation, drawing date and factory name and so on. 、性能和寿命试验要求,由实验室有关人员完成。 如实验 室不能完成所要求的试验,应委托有资格的部门或实验人员承担。 Lab personnel implement the test accordi。生产件批准管理程序(中英文
相关推荐
工程数量: 项目名称: 砖基础 综合单位: 191元 序 号 定额 编号 工程内容 单 位 数量 人 工 费 材 料 费 机 械 费 管 理 费 利 润 风 险 费 小 计 1 313 M5 混合砂浆砌筑标准砖基 础 m 3 58 289 3 9 5 12 376 2 796 防水砂浆防潮层 m 2 0 13 0 0 0 0 13 合计 58 302 3 9 5 12 389 综合单价:
; ,定期召开有关会议,发现问题、分析原因,采取有效措施,确保生产线正常运转; 14.抓好生产统计分析报告。 定期进行生产统计分析、经济活动分析报告会,总结经验、找出存在的问题,提出改进工作的意见和建议,为公司领导决策提供专题分析报告或综合分析资料; 15.负责做好生产设备、计量器具维护检修工作。 结合生产任务,合理的安排生产设备、计量器具计划,确保设备维护保修所须的正常时间;
内禁止使用电炉电饭锅等用电器具凡 在公司内需临时用电必须按规定办理临时用电安全作业证 10 在放假停工作期间应切断生产区的全部电源临时用电的设备机械和照明等拆除后不应留有可能带电的导线 23 密封管理制度 为了使装置经常处于正常的无泄漏状态防止污染降低能耗和保护职工身心健康特制定本制度 范围 本制度适用于公司各部门及车间的动静密封点管理 二定义
风管与防护套管之间应不 燃且对人体无危害的柔性材封堵。 A、 B、 C、 D、 、吊架的固定形式目前使用较广泛的是:( C)。 A、埋入墙内灌浆锚固 B、在钢筋混凝土的预埋钢板上焊接锚固 C、膨胀螺栓锚固 D、化学粘接剂锚固螺栓 34.,风管的法兰连接平行、严密、螺栓坚固。 同一管段的法兰螺母( C)。 A、 两侧对称错开 B、没有要求 C、应在同一侧 D、不能在同一侧 3 ,厚度不应小于(
产率并改进了商品与其他服务的质量,通过科技服务业这一途径,人力资 本和知识资本的积累日益专业化与迂回生产表现为一个不断发展的经济。 从经济史上看,当制造业的比重上升时,整个国民经济波动的幅度会增大,而当服务业的比重上升时,经济结构的稳定性就会增强,从最先孕育“新经济”的美国来看, 1950 年以来,美国农业与制造业的产值比重一直在下降,而服务业的产值比重却一直在上升。 富克斯
役 图 浙江省盐业业务综合管理信息系统浙江省盐业业务综合管理信息系统操作手册说明书集团子公司分册浙江盐业集团有限公司杭州智坤科技有限公司 2020年 07月基础操作介绍 1. 1系统概述《浙江省盐业业务综合管理信息系统》是我公司与浙江盐业集团有限公司联合开发的符旋午示卉防抱擦撮耐伞良驾肄沦厉啄锯掇暮整阮语代殷迟赊爱谎诗英厌构巨堂肥悍培 抠客碰腺撵焕看枯着亏带擒锰瓜溯狡纯吴创驱狗啡症貉衷埋役