综合管线信息管理系统设计方案(supermap内容摘要:
for each missing one handle 10 Yuan assessment ask f or ce people. Light ing box door cover is m issing 10 Yuan assessm ent t ask f orce people. Dist ribut ion box ( Cabi) lack of dir ect light bulbs each evaluat ion t ask f orce 10. Damaged alum inum signs ever y 10 Yuan assessment t ask f or ce people. Free signs every 10 Yuan assessment ask f or ce people, sign an unclear t ask f or ce on assessment of people 10. Valves, inst r ument per son wit h no signs each evaluat ion t ask f or ce 10. M ain st eam, wat er , sm oke, wind, gas pipeline, pr essure vessel, not accor ding t o t he st andard paint ing, num bering, labeling t he device nam e and m edia t r ends, . . . Of t he defect log book shall be kept pr oper ly, im proper lost each of t he evaluat ion r esponsibilt y f or 100 Yuan. Equipm ent def ect s, oper at ors m ake r ecords in a t im ely m anner and not if y maint enance per sonnel, gener al m aint enance personnel do not pr ocess t he r un not o r egist er each of t he r uns and over haul t he squad leader checking 50, elim inat e less t ime or r efuses t o check and r epair a m onit or 50 def ect s. Rot ating equipm ent m echanical, t hermal, elect rical, oil eakage oil each evaluat ion t ask f or ce 10. Leakage of pump packing, r et aining r ing displacem ent , damage, dr ainage holes clogged bear ings int o t he wat er every 10 Yuan assessment ask f or ce people. Oil m ir r or , oil evel gauge not see oil evel ever y 10 Yuan assessment ask f or ce people. Equipm ent dam age due t o per sonal negligence, pensation f or t he value of equipment 50%. Cr ac king because of bad f r eezing m easur es each valve, wat er pump ( a) pensation f or t he value of equipm ent 30%. Due t o oper at or er r or or does not enfor ce st rict f uel syst em and equipm ent r epair man maint enance, im proper missioning equipm ent par ts and damage, pensation f or t he value of 50%. Dam age t o equipm ent should be pr ompt ly r epor t ed t o t he pr oduct ion t echnology sect ion, undeclar ed assessm ent wor kshop Dir ect or 100 Yuan/tim es. Af ter overhaul, t he equipm ent should be no gr ease, no cor rosion, f ouling and powder accumulat ion and debr is f ree, not up t o t he standard assessment char ge 20 Yuan each. The constr uction sit e should have suf icient light ing and necessar y secur it y m easur es, pr ohibit ing t he j um bled m ess of equipm ent and m ater ials, r epair and m aint enance wor k af ter t he finished wor k should be done bef ore ever y heads of evaluation t he ar ea is clean cont r ar y t o 50 Yuan. Due t o m aint enance needs a t em por ar y m ount , cut of f t he st air r ailings, open channel cover , should be pr om pt ly r em oved af t er plet ion and r est or at ion of of f ender assessm ent char ge1 目 录 1 前言 ................................................................................................................................ 3 2 系统建设目标 ................................................................................................................ 3 目标定位的原则 ................................................................................................. 4 系统总体目标 ..................................................................................................... 4 3 系统建设原则 ................................................................................................................ 5 4 系统总体设计 ................................................................................................................ 6 技术设计依据 ..................................................................................................... 6 系统技术路线 ..................................................................................................... 7 操作系统 .................................................................................................. 7 GIS 软件平台 ........................................................................................... 7 数据库平台 .............................................................................................. 9 系统运行环境 ........................................................................................ 10 系统实施方法 ....................................................................................................11 充分、细致的调查研究 ..........................................................................11 协调关系,统一安排 .............................................................................11 重视数据库建立工作 ............................................................................ 12 标准化问题 ............................................................................................ 12 要具有长期规划 .................................................................................... 12 数据结构的合理性 ................................................................................ 12 系统总体设计 ................................................................................................... 12 系统运行模式 ........................................................................................ 12 网络结构 ................................................................................................ 15 Yuan. Four t h sect ion equipm ent m anagement evaluat ion system of equipm ent m anagem ent evaluation system t he 49t h ar ticle Dg20 valve is m issing a wheel below 10 Yuan assessm ent ask f or ce people. Lack of pr essure piping and pr essure vessel ever y 10 Yuan assessm ent ask f or ce people. Pipe header lack of t her momet er s, pr essur e vessels and other equipment , each evaluation t ask f or ceman 10. Equipment lubr ication lack an oil Cup assessm ent ask f or ce 10. Equipment lack of li t ing r ings, 10 of every assessment ask for ce. Each lacked a gr ounding of elec tr ical equipm ent line inspect ion t ask f orce people 10.。综合管线信息管理系统设计方案(supermap
相关推荐
含税价。 :乙方材料进场开工后,甲方支付乙方 工程 款 30 万元 , 其余按 工程进度 支付 ,工程竣工验收合格后,乙方向甲方提供正式发票,甲方应支付到乙方合同总价 95% 的工程款。 扣留 质量保修金为工程价款 的 5%,待工程保修期满后,无质量问题,给予支付。 第三条 甲方工作 开工前,甲方向乙方进行现场交底,清除影响施工的障碍物。 向乙方提供施工所需的水、电源。 第四条
据树木的习性及长势而定,主干强的宜保留主干,采用塔形、圆锥整 形;主干长势弱的,易形成丛状树冠,可修成圆球形、半圆球形或自然开心形,此外还应考虑所栽植地环境组景的需要。 整形修剪的方式很多,应根据树木分枝的习性,观赏功能的需要,以及自然条件等因素来考虑。 a 整形修剪方式 自然式修剪:各种树木都有一定的树形,保持树木原有的自然生长状态,能体现园林的自然美,称为自然修剪; 人工式修剪
10% 达到 ____% 季度 /年度 综 合 管 理 部 文件资料处理及时率 10% 达到 ____% 季度 /年度 综 合 管 理 部 公关计划完成率 10% 达到 ____% 季度 /年度 综 合 管 理 部 法律纠纷处理 及时率 10% 达到 ____% 季度 /年度 综 合 管 理 部 客户 领导满意度评分 15% 不低于 ____分 季度 /年度 评 分 领 导 后勤服务满意度评分
公司文件 资料包括 视频影像资料、 公司红头文件、 合同文本及 招投标文件 、 会议纪要等纸质文件 资料归档整理,确保公司档案完. . 整无缺,及时 立卷 归档。 ( 八 ) 安全保卫 工作 安全工作一直是 公司 重点 工作 之一,公司 严格遵守集团公司安全 管理要求,采取有效措施加强公司 办公区、宿舍、员工安全管理,确保 公司 2020 年无安全事故发生。 切实 加强公司安全管理,对公司