静止式进相器可行性项目分析报告(编辑修改稿)内容摘要:

.,ltd 20xx 年 7 月 28 日 On july 襄阳鼎鼎电气产品配置表 Product configuration of Xiangfan Dingding Electronic 产品名称 Description 产品型号 Model 产品数量 quantity 进相器 Stationary phase advancer DP5800G 1 元器件配置清单(适配绕线型交流异步电动机转子电流 600800A) ponents list for Rotor 600800A, Wound AC induction motor 序号 S/N 名称 Description 型号 Model 单位 unit 数量 quantity 备注 remark 1 真空接触器 vacuum contactor CKJ51250A/1140V AC380V 台 set 2 上海志远 shanghai zhiyuan 2 变压器 Transformer DB- 12KVA 台 set 1 志远创新 Zhiyuan Innovation 3 可控硅 /散热器 SCR/Heat sink KP800A/1200V/SF15 套 set 12 台基 Taiji 4 电抗器 Reactor CKS700A 台 set 6 志远创新 Zhiyuan Innovation 5 轴流风机 Axial fan 200FZY4D/380V 台 set 6 九龙电讯 Jiulong Electronic 6 霍尔电流传感器 Hall current sensors JLK20 600A 套 set 3 茶花 Chuahua 7 智能控制器 Intelligent controller 套 set 1 鼎鼎电气 Dingding Electronic 8 控制变压器 Control transformer KB160VA 台 set 1 志远创新 Zhiyuan Innovation 9 空气开关 Air switch S293 C100A 只 pc 1 ABB 10 空气开关 Air switch S263 C10A 只 pc 1 ABB 11 交流接触器 AC contactor A503011 AC220V 只 pc 1 ABB 12 交流接触器 AC contactor A93010 AC220V 只 pc 1 ABB 13 中间继电器 Intermediate relay N22E AC220V 只 pc 2 ABB 14 按钮 Button CP11011( 1红 1绿) 1 red 1 green 只 pc 2 ABB 15 信号灯 Warning lump CL523( 2红 1绿) 2 red 1 green 只 pc 2 ABB 16 旋钮 Button XB2BD33C 只 pc 1 ABB 17 交流电流表 AC Ammeter 42L6- A 150/5A 块 pc 1 德力西 Delixi 18 功率因数表 Power factor meter 42L6- COSφ 100V/5A 块 pc 1 德力西 Delixi 19 电阻 Resistance RX21 1KΩ /8W 只 pc 12 鼎鼎电气 Dingdingelectronic 20 电容 Reactor F/500V 只 pc 12 鼎鼎电气 Dingdingelectronic 21 固态继电器 solid relay MGR1 D4825 只 pc 1 美格尔 Meiger 22 铜排 Copper bar TMY5*50 米 meter 10 湖北铜材 Hubei copper 23 铜排 Copper bar TMY4*50 米 meter 12 湖北铜材 Hubei copper 24 辅材附件 associated 套 set 1 鼎鼎电气 Dingdingelectronic 25 柜体 Cabi 1200*900*20xx 台 set 1 鼎鼎电气 Dingdingelectronic 襄阳鼎鼎电气有限公司 Xiangyangdingding electrical co.,ltd 20xx 年 7 月 28 日 On july 中高压交流电动机固态软起动装置 可行性报告 Feasibility analysis of Medium, Highvoltage solidstate soft starter 引言 Introduction 贵公司目前正在使用的 1 台高压变频器由于经常出现故障,耽误生产,造成公司很多的损失。 为了确保生产设备连续运行,可选用高压固态软起动器作为备用,当在高压变频器故障时,可切换到高压固态软起器运行。 高压固态软起动器性能可靠,结构简单。 根据现场情况,负载是高温风机,系统电压为 10KV,电动机功率为 1800KW,选用高压软起动器的型号为HPMVDN10200,即可满足现场使用要求。 A highvoltage inverter currently being used in your pany is making break down frequently, delays your production resulting in the big loss for you. In order to ensure continuous operation of your production, the choice of highvoltage solidstate soft starter would be a great solution. When the highvoltage inverter failure, it can be switched to the highpressure solidstate soft starter. High voltage solidstate soft starter is reliable with simple structure. According to onsite factors, the loading is high temperature fan, system voltage 10KV, motor power 1800KW, we propose highvoltage soft starter model HPMVDN10200 to meet your onsite requirements. HPMVDN 中高压交流电动机固态软起动装置技术文件 HPMVDN MediumHigh Voltage AC Motor SolidState Soft Starter Technical Specification I. Supply scope 供货范围 HPMVDN10200 MediumHigh Voltage AC Motor SolidState Soft Starter: 1 Unit; HPMVDN10200中高压交流电动机固态软起动装置: 1 台; II. Product summary 产品概述 With the advancement of technology, the application of industrial production equipment have bee more mon in large motors, electric motor in the system due to the large volume relative proportions is too high, and ordinary induction motor starting at full voltage direct starting current will reach the rated current 5 to 7 times, where the grid will allow full voltage starting system pressure drop is very large, it will destroy the normal operation of other devices in the same work, can cause serious or even destabilize the grid, resulting in system failure tripping. If the direct start, will produce higher peak torque, resulting in harmful impact on the motor and the entire mechanism. Therefore, we must take effective measures to reduce the starting voltage and current. Conventional reactors and autotransformers start mode is a fixed stepdown approach, but not a good match with the load curve of equipment, so limiting reach good results, it cannot easily adjust the start according to load conditions parameters, to ensure that the system is stable start. 随着技术的进步,工业生产中装备中大型电动机的应用愈来愈普遍,由于大型电动机在系统中容量相对比例太大,且普通感应式电动机在全压直接起动时,起动电流会达到额定电流的 5~ 7倍,全压起动将使所在电网系统压降非常大,这会破坏同网其它设备的正常运行,严重时甚至会引起电网失去稳定,产生系统故障跳闸。 如果直接起动,也会产生较高的峰值转矩,从而对电动机及整个机械装置造成有害的冲击。 因此,必须采取有效措施,降低起动电压和电流。 传统的电抗器和自耦变压器起动方式是一种固定式降压方式,但不 能很好与设备的负载曲线匹配,所以达不到很好的限流效果,也不能根据负载状况方便的调整起动参数 ,保证系统稳定起动。 HPMVDN solidstate mediumhigh voltage AC motor soft starter is based on the new third generation of hightech equipment with electrical digital microprocessor control technology and modern power electronic control technology, designed for highvoltage large motor soft starters provide special equipment, for motor provides the best buck limiting soft start mode. It is an advanced, microprocessorbased control, connected via fiber in voltage soft starter, main startstop for asynchronous and synchronous motors. Load current is subject to different conditions, to achieve better results starting device is designed to control a variety of functions to achieve the minimum required current to the starter motor to start smooth acceleration, effectively reducing the starting grid voltage drop, the starting time to overe and mechanical shock。 soft stop when required, the motor can be controlled to provide gentle decreasing voltage, making the system a smooth stop. HPMVDN 中高压交流电动机固态软起动装置是基于第三代数字微处理器控制技术和现代电力电子控制技术设计的新型电气高科技设备,是为高压大型电动机软起动提供的专用设备,可为电动机提供最佳的降压限流。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。