建设工程项目施工现场管理内容摘要:
lan t o inst all t he inf r ar ed r adiation equipm ent or f ences and elect r onic equipm ent as well as video sur veilance equipm ent, t he specif ic needs of t he equipm ent and m aterials quant it ies we wi l det ail lat er . 1. 4 t he pr ogramm e accor ding t o your pany39。 s sit e t o see and list en t o t he leader ship pr oposal, and in accor dance wit h t he act ual needs of t he pr oj ect, wit h r ef er ence t o t he r elevant int er nat ional st andar ds and nat ional st andards, bined wit h t he exper ience accum ulat ed by t he pany engaged in m ult iple pr oj ect s, pr epar e t he t echnol gy package. If t he content s or any ot her aspect of t he pr ogr amm e has not det ailed wher e we wel e your valuable m ents. Second, t he design pr inciples of t he pr oj ect design f olows t echnology advanced, f unctional, st able and cost saving pr inciples. And considering const r uction, m aint enance and oper ation, and f or f ut ur e developm ent , expansion, r econst r uc tion and ot her f act ors leave r oom f or expansion. Design elem ents of t he syst em is t he syst ematic, int egr at ed and pr ehensive。 design has t he scient if icit y, r easonabilt y and oper abilt y. I ts has f olowing pr inciples: 2. 1, and advanced and applicabilt y used cur r ent ly m ost advanced of soft , and har dware and t he work t echnology, err ors r ate low, pat ible sex st rong, upgr ade easy, used m odule t ype st ructur e, expansion convenient , no r epeat constr uct ion invest ment, syst em of t echnology perf orm ance and qualit y index should r eached int er national leading level。 while, syst em of inst alat ion debugging, and soft ware pr ogram ming and oper at ion using and should sim ple, easy m ast er, f or China condit ions and t his proj ect of f eat ures. Set t he num ber of advanced t echnology in a t he syst em s, r eflect s t he cur rent level of t he lat est development of put er and wor k t echnology, adapted t o t he r equir ements of t he tim es. While t he system is t he syst em used f or various m anagem ent levels, it s funct ions ar e configur ed t o provide t he user wit h f ort able, safe, f ast and convenient t o 3. 1, t he int elligent building design st andar ds ( GB/t 50314 200) , t he design st andar d f or int elligent building syst em s engineer ing ( DB32/191 198) , t he code f or engineer ing design of generic cabling syst em f or cit y r esident ial buildings ( CECS/119 2020) 3. 4, code f or design of buildings and cam pus cable syst ems engineering ( GB/T5031 200) 3. 5, t he code f or elect rical design of civil bu ildings ( J GJ / T16 92) 3. 6, t he code f or civil closed cir cuit m onit or ing TV syst em engineer ing t echnology ( GB/50198 94) 3. 7, t he t ypes of syst em ear thing and saf et y t echnical r equir em ents ( GB14050 93) 3. 8, of t he securit y engineering pr ocedures and r equir em ent s ( GA/T75 94) 3. 9, t he r ules of securit y engineer ing accept ance ( GA/T308 201) 3. 10, t he indust rial design of TV syst em code ( GBJ 115) 3. 11, t he Secur it y checks pr evention syst em pass f or gr aphics s ym bol ( GA/74 94) 3. 12, and f ir e linkage cont r ol equipm ent Gener al t echnology condit ions ( GB 16806 197) f our, and syst em f unction and f eat ur es in syst em bot h advanced, and pr actical, and m at ur e, and r eliable, and do syst em open, and can ext ended sex good, bot h invest m ent r easonable, and benefit s best of pur pose, bor der secur it y alar m system on sit e equipm ent f or concent rat ed m onit or ed, and cont r ol and m anagem ent, m akes t hese equipm ent t o secur it y, and r eliable, and ef ficient t o r un, M axim ize int elligent m anagem ent r ole t o cr eat e a saf e, healt hy, f or t able and pleasant , and t o im pr ove t he ef ficiency of a good envir onm ent and save ener gy, and r educe m aint enance per sonnel. Accor ding t o t he pr oj ect 39。 s envir onm ental needs, and engagem ent f unctions t o est ablish t he pr oj ect boundar y secur it y alar m syst em, in a Wor d, t his boundar y is a pr oj ect of t he secur it y alar m syst em is highly aut om at ed and ef ficient hospit alit y f or a f or t able, convenient , and highly secur e envir onm ent. Five, schem e design based on design pr inciples, design specif icat ions and accor ding t o int er national and dom est ic st andar ds, and in accor dance wit h user needs, as well as dr awings and r elat ed inf or m ation pr ovided by, and j oining t he pr oj ect 39。 s act ual sit uat ion and f ut ur e developm ent r ends, bor der secur it y alar m systems f or t he pr oj ect design. 5. 1. principle of system and bur glar alar m system f r om det ect or s, r egional dir ect or s, and t he alar m cont r ol cent r e posed of t hr ee par t s. I t s principles as in t he f olow ing char t : det ect or s f or bur glar alar m syst em is inside and out side t he building in key ar eas, im por tant places, pr ot ection, when t he pr obe t o ilegal invader s, t he signal t r ansmit t ed t o t he alar m contr ol: sound and light alar m , display addr ess, about he per son on dut y af t er r eceiving t he alar m , t ake m easur es accor ding t o t he sit uation, t o contr ol t he developm ent of t he sit uation. Ant i t hef t alar m syst em alar m f unction in addit ion t o t he above, t her e is linkage f unct ion. Such as: open t he alar m light ( including inf r ar ed lam p) , int er act ive audio and video m at rix cont r oler , swit ch on t he alar m cam er a on t he spot , m at rix cont r oler TV ser ies of contr ol: m onit or displays an im age, video f oot age, m ult im edia cont r oler aut om at ic or hum an . . 8. 1 t he t hr ee guar ant ees per iod war r ant y 1, war r anty 1) service period f r om dat e of accept ance of engineering, a 1 year war r ant。建设工程项目施工现场管理
相关推荐
按不同的类别,进行详细的登录、存放,建立资料归档系统。 该系统应简单和易于保存,但内容应足够详细,以便于快速查处已归档的资料。 监理资料的归档,一般按以下几类方法进行: 1)一般函件。 与业主、承包商和其他有关部门来往的函件按日期归档;监理工程师主持或出席的所有会议记录按日期归档。 2)监理报告。 各种监理报告按次序归档。 3)计量与支付资料。 每月计量与支付证书,连同其所附资料每月按编号归档;
分公司责任人如有挂靠转包、出卖、出租、出借公司 第 4 页 证照等其它有损公司信誉的行为出现,公司有权解除本 责任 书,撤换责任人,并追究 分公司责任人的经济责任、法律责任。 6.根据中华人民共和国建筑法规定, 分公司责任人必须保证使用成建制劳务队伍并到集团公司签订劳务合同,并保证及时足额支付劳务费用。 分公司主要材料或甲方指定材料报集团公司主管部门审核后进行采购。 第四章 利润上缴及办法
(或施工方案)和工程进度计划方案。 ( 7) 、认真核定工程量,并按合同约定日期,及时支付工程预付款和工程进度款。 ( 8) 、检查监督承包人是否按确认的进度计划组织施工,若工程实际进度与经确认的进度计划不符,要责令承包人提出改进措施,尽快赶回施工工期。 ( 9) 、核定并签发施工中发生的临时计时工日。 ( 10) 、如遇设计变更、工程量增减或其它可能延误施工工期的情况,要及时通知承包人
)。 工程结束后,按实结算。 上述工程价款已包括材料价、人工费用和各种税款,但是,有关施工设施、与其他施工单位间的配合费或对工程价款等双方另有特别约定的随约定。 工程进度款。 工程进度款按如下方式支付: ( 1)本合同签订后 日内,甲方应按合同暂定总价款的 %向乙方支付备料款 ,金额为人民币 元(大写: ); ( 2)工程施工完成总工程量的 %时但最迟在开工后 日内,甲方应按合同暂定总价款的
成合同的文件: 组成本合同的文件包括: 1 本合同协议书 2 本合同专用条款 3 图纸 4 双方有关工程的商洽,变更、签证等书面协议或文件视为本合同的组成部分。 国家和地方政府的有关法律、法规。 六 、乙方向甲方承诺按照合同约定进行施工,竣工并在质量保修期内承担工程质量保修责任。 七 、甲方向乙方承诺按照合同约定的期限和方式支付合同价款及其他应当支付的款项 八 、合同生效 双方签字盖章后生效 4