建设工程项目施工现场管理内容摘要:

lan t o inst all t he inf r ar ed r adiation equipm ent or f ences and elect r onic equipm ent as well as video sur veilance equipm ent, t he specif ic needs of t he equipm ent and m aterials quant it ies we wi l det ail lat er . 1. 4 t he pr ogramm e accor ding t o your pany39。 s sit e t o see and list en t o t he leader ship pr oposal, and in accor dance wit h t he act ual needs of t he pr oj ect, wit h r ef er ence t o t he r elevant int er nat ional st andar ds and nat ional st andards, bined wit h t he exper ience accum ulat ed by t he pany engaged in m ult iple pr oj ect s, pr epar e t he t echnol gy package. If t he content s or any ot her aspect of t he pr ogr amm e has not det ailed wher e we wel e your valuable m ents. Second, t he design pr inciples of t he pr oj ect design f olows t echnology advanced, f unctional, st able and cost saving pr inciples. And considering const r uction, m aint enance and oper ation, and f or f ut ur e developm ent , expansion, r econst r uc tion and ot her f act ors leave r oom f or expansion. Design elem ents of t he syst em is t he syst ematic, int egr at ed and pr ehensive。 design has t he scient if icit y, r easonabilt y and oper abilt y. I ts has f olowing pr inciples: 2. 1, and advanced and applicabilt y used cur r ent ly m ost advanced of soft , and har dware and t he work t echnology, err ors r ate low, pat ible sex st rong, upgr ade easy, used m odule t ype st ructur e, expansion convenient , no r epeat constr uct ion invest ment, syst em of t echnology perf orm ance and qualit y index should r eached int er national leading level。 while, syst em of inst alat ion debugging, and soft ware pr ogram ming and oper at ion using and should sim ple, easy m ast er, f or China condit ions and t his proj ect of f eat ures. Set t he num ber of advanced t echnology in a t he syst em s, r eflect s t he cur rent level of t he lat est development of put er and wor k t echnology, adapted t o t he r equir ements of t he tim es. While t he system is t he syst em used f or various m anagem ent levels, it s funct ions ar e configur ed t o provide t he user wit h f ort able, safe, f ast and convenient t o 3. 1, t he int elligent building design st andar ds ( GB/t 50314 200) , t he design st andar d f or int elligent building syst em s engineer ing ( DB32/191 198) , t he code f or engineer ing design of generic cabling syst em f or cit y r esident ial buildings ( CECS/119 2020) 3. 4, code f or design of buildings and cam pus cable syst ems engineering ( GB/T5031 200) 3. 5, t he code f or elect rical design of civil bu ildings ( J GJ / T16 92) 3. 6, t he code f or civil closed cir cuit m onit or ing TV syst em engineer ing t echnology ( GB/50198 94) 3. 7, t he t ypes of syst em ear thing and saf et y t echnical r equir em ents ( GB14050 93) 3. 8, of t he securit y engineering pr ocedures and r equir em ent s ( GA/T75 94) 3. 9, t he r ules of securit y engineer ing accept ance ( GA/T308 201) 3. 10, t he indust rial design of TV syst em code ( GBJ 115) 3. 11, t he Secur it y checks pr evention syst em pass f or gr aphics s ym bol ( GA/74 94) 3. 12, and f ir e linkage cont r ol equipm ent Gener al t echnology condit ions ( GB 16806 197) f our, and syst em f unction and f eat ur es in syst em bot h advanced, and pr actical, and m at ur e, and r eliable, and do syst em open, and can ext ended sex good, bot h invest m ent r easonable, and benefit s best of pur pose, bor der secur it y alar m system on sit e equipm ent f or concent rat ed m onit or ed, and cont r ol and m anagem ent, m akes t hese equipm ent t o secur it y, and r eliable, and ef ficient t o r un, M axim ize int elligent m anagem ent r ole t o cr eat e a saf e, healt hy, f or t able and pleasant , and t o im pr ove t he ef ficiency of a good envir onm ent and save ener gy, and r educe m aint enance per sonnel. Accor ding t o t he pr oj ect 39。 s envir onm ental needs, and engagem ent f unctions t o est ablish t he pr oj ect boundar y secur it y alar m syst em, in a Wor d, t his boundar y is a pr oj ect of t he secur it y alar m syst em is highly aut om at ed and ef ficient hospit alit y f or a f or t able, convenient , and highly secur e envir onm ent. Five, schem e design based on design pr inciples, design specif icat ions and accor ding t o int er national and dom est ic st andar ds, and in accor dance wit h user needs, as well as dr awings and r elat ed inf or m ation pr ovided by, and j oining t he pr oj ect 39。 s act ual sit uat ion and f ut ur e developm ent r ends, bor der secur it y alar m systems f or t he pr oj ect design. 5. 1. principle of system and bur glar alar m system f r om det ect or s, r egional dir ect or s, and t he alar m cont r ol cent r e posed of t hr ee par t s. I t s principles as in t he f olow ing char t : det ect or s f or bur glar alar m syst em is inside and out side t he building in key ar eas, im por tant places, pr ot ection, when t he pr obe t o ilegal invader s, t he signal t r ansmit t ed t o t he alar m contr ol: sound and light alar m , display addr ess, about he per son on dut y af t er r eceiving t he alar m , t ake m easur es accor ding t o t he sit uation, t o contr ol t he developm ent of t he sit uation. Ant i t hef t alar m syst em alar m f unction in addit ion t o t he above, t her e is linkage f unct ion. Such as: open t he alar m light ( including inf r ar ed lam p) , int er act ive audio and video m at rix cont r oler , swit ch on t he alar m cam er a on t he spot , m at rix cont r oler TV ser ies of contr ol: m onit or displays an im age, video f oot age, m ult im edia cont r oler aut om at ic or hum an . . 8. 1 t he t hr ee guar ant ees per iod war r ant y 1, war r anty 1) service period f r om dat e of accept ance of engineering, a 1 year war r ant。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。