浦发银行借款合同内容摘要:
Bank of China in the corresponding period while signing the present contract is: (“ (annual interest rate)” ). The executed interest rate is determined according to the benchmark loan interest rate on the actual date of loan release regulated by the People s Bank of China in the corresponding period as well as the floating proportion under the present contract. Monthly interest rate = annual interest rate / 12, daily interest rate = annual interest rate / 360, and the interest rate per period = annual interest rate the number of the month(s) of each period / 12. If the benchmark loan interest rate regulated by the People s Bank of China is adjusted within the method: □ Adjustment by year, and interest accrual by stage. That is, the new interest rate will be executed according to the benchmark loan interest rate regulated by the People s Bank of China as well as the floating proportion stipulated under the present contract as of the first calendar day of the next calendar year after the interest rate adjustment. □ No interest rate adjustment, and no interest accrual by stage. □ □ Fixed interest rate It shall be executed according to the fixed loan interest rate and floating range stipulated by Shanghai Pudong Development Bank in the corresponding period. The loan interest rate under the (“□ above □ below %” ) on the basis of the fixed loan interest rate published by Shanghai Pudong Development Bank in the corresponding period. If the People s Bank of China adjusts the benchmark loan interest rate or Shanghai Pudong Development Bank adjusts the fixed interest rate applicable to this business within the loan period, then the interest rate executed in the present contract will not be adjusted. The fixed interest rate of the (“ rate)” ). The executed interest rate is determined according to the fixed loan interest rate on the actual date of loan release published by the People s Bank of China in the corresponding period as well as the floating proportion under the present contract. Monthly interest rate = annual interest rate / 12, daily interest rate = annual interest rate / 360, and the interest rate per period = annual interest rate the number of the month(s) of each period / 12. □ Quasifixed interest rate (“ from the date of loan release. That is, it will be executed according to the fixed loan interest rate and floating range stipulated by Shanghai Pudong Development Bank in the corresponding period (the loan period is from the date of loan release till the date of expiry of the contract). The loan (“□ above □ below %” ) on the basis of the fixed loan interest rate published by Shanghai Pudong Development Bank in the corresponding period. If the People s Bank of China adjusts the benchmark loan interest rate or Shanghai Pudong Development Bank adjusts the fixed interest rate applicable to this business within the loan period, then the interest rate executed in the present contract will not be adjusted. (“ % (annual interest rate)” ). The executed interest rate is determined according to the fixed loan interest rate on the actual date of loan release published by the People s Bank of China in the corresponding period as well as the floating proportion under the present contract. Monthly interest rate = annual interest rate / 12, daily interest rate = annual interest rate / 360, and the interest rate per period = annual interest rate the number of the month(s) of each period / 12. a floating interest rate will be executed. That is, it shall be executed according to the benchmark loan interest rate and floating range stipulated by the People s Bank of China in the corresponding period (the loan period is calculated from the date of the loan release). The loan interest rate under (“□ above □ below %” ) on the basis of the benchmark loan interest rate published by th。浦发银行借款合同
相关推荐
派流程 由营业主管根据需要填写公派申请单,公派时间不得超过 10 天 ,若有特殊情况超出公派时间,则由营业部部长批示为准。 公派审批单由地区经理进行审核,营业部部长进行审批。 海澜之家市场部管理流程手册 15 第十三节 《营业部新开门店汇总表》递交流程 新店开业后,地区经理在次月 1 日,填写《营业部新开门店汇总表》,以邮件形式发内务组长邮箱,内务组长整理后,上交市场部总经理审阅。 第十四节
— — 重力荷载及竖向地震作用 — — 9 度抗震设计时考虑,水平长悬臂 结构 8度、 9度抗震设计时考虑 所考虑的组合 γG γEh γEv γW 说 明 重力荷载、水平地震及竖向地震作用 — 重 力 荷 载 、 水 平 地 震 作 用 及 风 荷载 — 60m以上的高层建筑考虑 重 力 荷 载 、 水 平 地 震 作 用 、 竖 向 地 震 作 用 及 风 荷载 60m以上的高层建筑,
此外,编制消防安全管理手册还可以达到如下目的: —— 描述组织的方针、目标、承诺、程序和要求,展示组织消防安全管理体系重点解决的问题; —— 总体描述和实施有效的消防安全管理体系; —— 提供改进的常规控制,促进管理活动; —— 为消防安全管理体系审核提供文件依据; —— 当条件变化时,保持消防安全管理体系的连续性; —— 按消防安全管理手册的要求和相应的方法培训有关人员; ——
医院作为定点医院实施事前救助。 享受事前救助的资金核算。 享受事前救助对象的事前救助资金,在个人支出的部分按比例享受的医疗救助资金中扣减,具体事项由县民政局与定点医院对接。 八、医疗救助的申请、 审批程序 (一)由本人或户主向村(居)民委员会提出书面申请、如实提供已支付的大病重症的医疗诊断证明、医疗费用收据(原则上要原件
松散、不断股、固定可靠。 高压断路器运行 19 高压断路器应在铭牌规定的额定值内运行。 高压断路器操作的交、直流电源电压、液压操作机构的压力,应在规定范围内。 分、合高压断路器应用控制开关进行远方操作,长期停运的高压断路器在正式执行操作前应通过远方控制方式进行试分、合操作 2次~ 3次。 正常情况下不应手动操作分、合高压断路器,在远控失效的,紧急情况下可在操作机构箱处进行手动操作。
6 第二部分 合同条款 定义 “合同” 系指甲乙双方签署的、合同格式中载明的甲乙双方所达成的,包括所有的附件和构成合同的其它文件。 “货物”系指乙方根据合同约定须向甲方提供的一切设备、机械、仪表、备件、工具、手册和其它技术资 料及材料。 “服务”系指根据合同约定乙方承担与供货有关的辅助服务,如运输、保险及安装、调试、提供技术协助、培训和其他类似的服务。 “甲方”系指与中标投标人签署合同的单位。