扩建项目论文:扩建项目进度管理进度控制内容摘要:

orporation management anization, and the control research are executed. The study idea as follows: Firstly, introduce the progress of the project management of the basic theory, followed the progress of project control methods and procedures discussed in detail, and then it is selected for the case study for the Hebei Junfeng Geophysical Equipment Co. Ltd. detector production line expansion project. The detailed method is to set up a management anization, execute the project breakdown and design a detailed schedule planning, to do a thorough case research. In the case study, BP Neural work are selected to execute the project schedule optimization. Through the analysis and research in the paper, it is hoped to provide a re。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。