建筑承包商健康和安全资料constructioncontractorshealthsafetypack非洲矿业有限公司amlhse安全管理制度英文版内容摘要:

t outside a persons ability to immediately rectify, should be made safe with barricades, warning signs etc. and immediately reported to the Supervisor. Identified hazards should be recorded on a „Hazard Notification Record’ (Form SSPF01) where rectification cannot be pleted immediately or where the same hazard is continually being identified. Hazard Control Identified hazards should be controlled giving consideration the Hierarchy of Controls listed below. The preferential order of action is: 1st Preference ELIMINATION OR SUBSTITUTION TO REMOVE THE HAZARD 2nd Preference REDUCE THE HAZARD AT SOURCE 3rd Preference ENCLOSE THE HAZARD 4th Preference REMOVE EMPLOYEE FROM THE HAZARD 5th Preference REDUCE EMPLOYEE39。 S EXPOSURE TO THE HAZARD 6th Preference ISSUE PERSONAL PROTECTIVE EQUIPMENT Project Health amp。 Safety Implementation Inspection The Project Manager shall upon occupying the site shall mence implementing the Health amp。 Safety System. The AML HSE Department shall provide advice and checklists for progress to be documented. Daily HSE Inspections Daily hazard inspections shall be performed by personnel nominated by the Project Manager. The nominated person maybe any member of the Project Team. The Daily HSE Inspection Record (Form SSPF02) shall be used to record daily checks. Revision: Rev 0 Date: 16042020 Contractors Health amp。 Safety Pack 9 JOB SAFETY ANALYSIS (JSA) JSA breaks a planned activity into manageable steps, identifies the hazards associated with each step, assess the risks and ensure that appropriate controls and checks exist to eliminate or control the hazards. The benefits of a JSA are: promotes participation and consultation。 increases knowledge about the job。 provides a prestart check for the job。 improves safety management。 clearly defines individual roles and responsibilities. A JSA shall be pleted for all activities that: are identified as having a high potential to causing serious injury and/or equipment and material damage。 deviate from standard practices. There are five steps in the JSA activity: a. break the job into basic steps。 b. identify any potential hazards for each step。 c. assess the risk for each identified hazard。 d. identify controls to eliminate or minimize each hazard。 e. assign responsibilities to personnel to implement the controls. The Supervisor responsible for the planned work activity shall plete a JSA Work Sheet (Form SSPF03) together with the relevant personnel involved in the work activity. The Supervisor shall discuss the JSA report with the personnel required to perform the work via a tool box meeting. The JSA Work Sheet shall be distributed as follows: Original: Site Safety Advisor。 Copy One: Supervisor in charge of the work activity and must be available on site. SKILLS AND COMPETENCIES Procedure The Company will ensure that its employees are adequately trained to a level of petency sufficient to ensure their health and safety when at work. Assessment The Company will undertake a training/petency assessment of all employees prior to the mencement of work on the nominated site. Where skill deficiencies are detected appropriate training will be provided before work mences so that employees can perform their designated duties safely. Revision: Rev 0 Date: 16042020 Contractors Health amp。 Safety Pack 10 Hamp。 S INDUCTION Procedure The Company will ensure that persons carrying out the nominated work have relevant training including Safety Induction Training and the Cultural Induction. Workers will not carry out construction work until they have received these minimum requirements 1. General Safety Induction (by AML) 2. Cultural Induction (by AML, expat staff Only) 3. Site Specific Induction (by Contractor) All workers will receive the Hamp。 S induction training before work on site mences and a record of the training provided on the Training Record (Form SSPF04.) ELECTRICAL Procedure The Company will ensure that the use of electrical wiring, portable tools and extension leads will be in accordance with the Code of Practice Electrical Practices for Construction Work. All electrical equipment to be brought on site will be listed in the Electrical Equipment Register Form SSPF05. The register will be pleted prior to mencement of the works and maintained for the duration of the works on site. Inspection amp。 Tagging All electrical leads, portable power tools, junction boxes and earth leakage devices will be tested, inspected by a suitably qualified person and labeled with a tag of current date before being brought on site. Where this is not possible African Minerals Limited will be advised immediately and assistance requested in order to ply with the requirements of the Code of Practice Electrical Practices for Construction Work. Selection and Use:  Whilst on site any electrical equipment found without a tag of current date issued by a suitably qualified person will not be used.  Where an electrical item is located without a current inspection and test tag proof of the electrical items currency of inspection and test will be provided or the item removed from site immediately.  When used on a construction site all electrical equipment will be connected to an Earth Leakage protection/residual current device at all times.  Where practicable all electrical leads will be kept off the ground on insulated hangers or on insulated lead stands.  Extension leads will not be joined together.  All plugs and sockets will be nonwirable (moulded) or transparent.  Electrical equipment will not be placed on, or near, w。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。