国际钻井服务合同模板内容摘要:
instrumentalities, having jurisdiction over the Area of Operations. Host Government Contract means the instrument concluded between the Host Government and Company, along with other Joint Interest Owners, if applicable, and any extension, renewal or amendment thereof agreed to in writing and those laws, statutes, rules and regulations with respect to the exploration, development or production of hydrocarbons within the Area of Operations. 4 Joint Interest Owner means any cointerest owners, joint venturers, partners or colessees of Company for the property related to the Work or any other Person (other than Contractor or Contractor‟s Subcontractors or its or their Affiliates) that shares an interest with Company in the right(s) to explore, develop, or produce within the Area of Operations. Key Personnel means the personnel referenced in Article and identified or listed by name or category in Schedule 2. Negligence means any sole or concurrent negligent act or omission, fault (including, without limitation, preexisting conditions), strict liability, breach of duty or warranty (statutory or otherwise), product liability, defect (whether patent, latent, or preexisting) of any property, equipment, or materials, unseaworthiness, and unairworthiness unless specifically otherwise stated, and shall include passive as well as active Negligence. The term Negligence does not include Gross Negligence. Notice means a munication delivered in accordance with Article 17. Participants mean any coowners, joint venturers, or partners of Contractor Group in connection with performance of the Work or any other Person participating in Contractor39。 s economic risk in connection with performance of the Work (other than any member of Company Group). Party or Parties mean(s) the Persons whose names appear following the words Contractor or Company on the first page of this Contract. For purposes of Article 20, lowercase parties shall have the meaning set forth in Article 20. Person means an individual, partnership, joint venture, corporation, limited liability pany, unincorporated anization, government entity, or any other entity. Public Official means Alternative 1 any individual holding a legislative, administrative or judicial office, whether appointed or elected。 any individual exercising a public function for a foreign country, including, without limitation, for a public agency or public enterprise。 any official or agent of a public international anization。 and any political party or party official, or any candidate for public office. Alternative 2 any individual holding a legislative, administrative or judicial office, whether appointed or elected。 any individual exercising a public function for a foreign country, including, without limitation, for a public agency or public enterprise。 and any official or agent of a public international anization. Regardless of Cause means without regard to Negligence, in whole or in part, of the Party or other Person seeking indemnity or of any other Person. Where expressly stated, Regardless of Cause also means without regard to Gross Negligence, in whole or in part, of the Party or other Person seeking indemnity or of any other Person. 5 RePerform, RePerformed, or RePerformance means reperform and, where applicable, also means corrective services that are within the scope of services typically provided by Contractor necessary to correct the nonconforming services provided by Contractor. Shall Be Liable For And Indemnify means the indemnifying Party shall be solely responsible for and assume all liability for and Defend, release and indemnify and hold harmless the indemnified Party or other Person. Subcontractors means subcontractors of any tier. Taxes means any and all taxes imposed by any taxing authority including, without limitation, withholding taxes, ine tax on nationals of the Country of Operations and on foreigners and taxes relevant to employment of such persons, all corporate taxes, imports, duties, levies, stamp duties, charges and other assessments and payments in the nature of taxes, wherever payable, excluding VAT. Third Party means any Person other than any member of Contractor Group or Company Group. Optional (If Article selected) ThirdParty Beneficiary means any member of Company Group (other than Company) or any member of Contractor Group (other than Contractor). VAT means Value Added Tax or similar tax on goods or services, including, without limitation, sales, use, excise, and similar taxes (as amended from time to time) as may be applicable to the Work. Work means that which is, identified, described, or requested in Schedule 2, including, without limitation, the entirety of the operations conducted by Contractor Group under, arising out of, relating to, or in any way connected with this Contract, and all services to be rendered and any equipment to be provided by Contractor Group under this Contract. Work Site means the area where Work is intended to be performed, such as the drilling location, including, without limitation, the drilling rig, drilling vessel or platform and the immediate area adjacent thereto that is utilized for the Work. ARTICLE 2 INTERPRETATION Schedules and Controlling Documents This Contract consists of the body of this Contract and the following Schedules that are attached hereto: Schedule __ Schedule __ Schedule __ Schedule __ Schedule __ 6 In the event of a conflict between the body of this Contract and the Schedules, the body shall govern and prevail. In the event of a conflict between or among any of the Schedules, precedence shall be determined by the descending order in which the Schedules are listed above. Contract Work Contractor shall perform the Work as described in this Contract and the attache。国际钻井服务合同模板
相关推荐
成。 其中降水延续到结构施工阶段。 ( 3)基础施工阶段 177。 以下结构施工阶段 计划 从 2020年 11月 21 日 开始 至 2020 年 6 月 15日完成。 该施工阶段包括 钎探验槽、垫层、地下防水及保护层 、 地下室结构、外国际项目管理专业资质认证 第 X 小组 凯旋家园工程 第 8 –页 共 58 页 墙及顶板防水和土方回填等。 ( 4)主体结构施工阶段 计划从
编号: 03622DOC3 日期: 软件配置管理 软件配置管理机构 在本软件系统整个开发期间,必须成立软件配置管理小组负责配置管理工作。 软件配置管理小组属项目总体组领导,由总体组代表、软件工程小组代表、项目的专职配置管理人员、项目的专职质量保证人员以及各个子系统软件配置管理人员等方面的人员组成,由总体组代表任组长。 各子系统的软件配置管理人员在业务上受软件配置管理小组领导
6. 温度范围: 40℃到 70℃(储 存时) 10℃到 60℃(安装时) 10℃到 60℃(工作时) 7. 免工具安装、单面拆卸口方便安装维护 8. ★为 了 维护方便、省时,要求透明模块及适合透明防尘盖设计。 必须要有效防止灰尘进入,保证性能 3) 信息面板(墙面型): 1. 规格: 86 型,单 /双孔, 2. 墙面用英式面板 ,具有原厂凹凸印标识,面板带有永久性防尘盖 3. PC 料
国际收支货币论认为,国际收支失衡的 根本原因应归咎于货币供求的不平衡。 国际收支失衡的调节 ( 1)固定汇率制下国际收支失衡的自动调节机制 如 MsMd 时,国际收支逆差→国际储备下降 → 基础货币 D+F下降 →货币供应量 Ms倍数下降→ 直到 Ms= Md时,国际储备停止流出→国际收支恢 复均衡 ( 2)本币贬值对国际收支失衡的调节 本币贬值→贸易品和非贸易品的价格提高→实际
项目经济效益较好,具有良好的财务生存能力,同时具有较强的抗风险能力,投资项目从地方和企业发展的角度来看是可行的,在经济上是合理的。 从宏观角度考察,投资符合国家投资发展政策,具有良好的社 会效益,从总体上评价,项目投资可行。 大悟金色华府国际酒店项目 第 6页,共 96 页 项目进行酒店建设,对于完善大悟县旅游服务设施,扩大旅游接待能力,提升对外开放形象
与空气调节设计规范》 GB5001920202020 年版 《建筑设计防火规范》 GB 500162020 《汽车 GB 502432020 《全国民用建筑工程暖通空调动力设计技术措施》 2020 年版 《民用建筑暖通空调设计技术措施》第二版 《公共建筑节能设计标准》 GB501892020 《城市区域环境噪声标准》 GB 309695 设计计算参数