浅议企业财务风险及防范毕业论文模板(编辑修改稿)内容摘要:
face increasingly plex. Financial risk is objective existence, the enterprise wants to eliminate risk and risk impact is absolutely impossible. Along with the increasingly enlargement of the scale of enterprises anization and the increasing petition, enterprises for major financial arrangement financial risk due to improper was buried lesson levels are not poor. The management activity of the enterprise, not only to consider the market demand environment, some of the technical means to change, still need to strengthen the control of financial risk. To guard against the financial risk of the enterprise, it is necessary to understand the sources and characteristics of the rise, and appropriate control and prevention, improve the enterprise risk prevention mechanism, the loss to a minimum for the enterprise to create the greatest benefits. 【 Keywords】 Financial exposure Preventive measures 1 一、 企业财务风险的概念 企业财务风险有狭义和广义之分,狭义的财务风险又称举债筹资风险,是指企业因举债筹资而丧失偿债能力导致发生财务风险的可能性,企业运用财务杠杆不当,短贷长投,可能致使企业无法偿本付息,因而潜伏风险。 广义的财务风险是指由于企业财务活动中各种不确定因素的影响,使企业财务收益与预期收益发生偏离,从而导致企业蒙受经济损失的可能性,不仅包括狭义的财务风险,而且还包括信用风险、利率风险、汇率风险、 证券投资风险。 财务风险是企业在财务管理过程中必须面对的一个现实问题,财务风险是客观存在的,企业管理者对财务风险只有采取有效措施来降低风险,而不可能完全消除风险。 二、 企业财务风险的特点 ( 一)客观性 财务风险是不以人的意志为转移而客观存在的。 也就是说,风险处处存在,时时存在,人们无法回避它,消除它,只能通过各种技术手段来应对风险,从而避免费用,损失的发生。 企业财务活动存在着两种可能结果,即实现预期目标和无法实现预期目标,这就意味着无法实现预期目标的风险是客观存在的。 (二)偶然性 风险是客观存在,从全社 会来看,风险的发生是必然的,但对于特定企业来说,风险的发生是偶然的,具有不确定性,人们尽管意识到某项活动可能会发生损失,但这种损失的可能性是否变为现实都是一个未知数。 风险的存在,导致企业财务活动的最终结果难以把握,从而使企业的财务活动变得更加复杂。 (三)全面性 财务风险存在于企业财务管理。浅议企业财务风险及防范毕业论文模板(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。