英语语音教案unit04内容摘要:
ng Lengthened, when an arresting /m/ is followed by a releasing /m/: some more The labiodal nasal, when followed by /f/: fort Allophonic variations of /n/: Dentalized before a labiodental /f/ or /v/:invite Velarized before /k/ or //: think Syllabic: button Lengthening, when /n/ arrests and releases adjoining syllables: ten names Allophonic variations of //: The alveolar [n], when followed by an alveolar: taking ten Syllabic: lock and key /w/ and /j/ /w/ and /j/ are similar in several ways. First, they are closely related to a vowel sound: /j/ is similar to the vowel /i:/ and /w/ is very much like the vowel /u:/. Because of this, they are also called semivowels. Secondly, neither /j/ or /w/ will ever occur in wordfinal position in English. Thirdly, they are both voiced consonants. In pronunciation, for /j/ the lips are relaxed and the tongue is in the high front space。 for /w/ the lips are rounded and the tongue is in the high back space. Then there is a movement away from these positions to whatever sound which follows. The more modern term for /j/ and /w/ is approximant, which is an articulation in which the articulators approach each other but do not get sufficiently close to each other to produce a plete consonant such as a plosive, nasal or fricative. /j/ and /w/ are not problem sounds for most Chinese EFL learners except it is necessary to emphasize the fact that the pronunciation of /w/ requires considerable lip rounding. /r/ /r/ is the other approximant besides /j/ and /w/ in English. The important thing about the articulation of /r/ is that the tip of the tongue approaches the alveolar area in approximately the way it would for a /t/ or /d/, but never actually makes contact with any part of the roof of the mouth. During the pronunciation, the tongue is in fact usually slightly curled backwards with the tip raised. /r/ is a difficult sound for many Chinese EFL learners. The difficulties。英语语音教案unit04
相关推荐
,先在联网的计算机上单独完成各个部分和环节,再进行组合完成。 因 特网的这种特性尤其适用于技术难度大、投资大、风险大的国际间合作开发的项目。 协作单位可通过远程会议等交流,因而能大大缩短设计周期,节约旅费开支,从而降低产品成本。 网络营销的平等性营造了相对公平的市场竞争环境 在传统的营销活动中,由于地理环境、配备设施、店面大小、市场规模、交通状况等因素,其营销效果和经营状况差别巨大。
(g): 2200;读数精度 (g): ;称盘尺寸( mm) 190 204,平均响应时间≤ ;重复性:177。 ;线性:≤。 台 5 20 电子天平( ) 称重范围 3100g,可读性 10mg,重复性≤ +10mg,线性≤ +20mg,称盘尺寸ф 150(mm)。 全自动外校。 有过载保护,可配 RS232 标准接口,可接计算机或打印机。 台 9 21 电子天平 称重范围 (g): 2100
然后门再 一次被关上,这次我们在外面,120多人在里面。 我们从厕所拿了两个拖布,咣咣两下,拖布断了,其中的两个大一的也爬在地上没了动静,旁边一起拖出来的大一的刚才还在叫嚣,看到如此场景也目瞪口呆,整个动手时间大约 3分钟,然后我们蜂一样的散去。 真是 一壶酒,一场江湖。 至于后果,就是赔钱看病,通报处理,老一套,没个新意。 有点新意的是,听说第二天晚自习的时候
一次语言变激烈了,还夹带着威胁:“听着,你这小鬼 ,我说过要你动起来,这不是说着玩 的。 ”在亨利听来,这意味着他必须收拾起玩具,慢慢地向浴室门走去。 要是妈妈快步紧逼,他就不得不火速完成这一任务。 可是,倘若妈妈在采取照例的最后行动之前心里走一下神,他就满可以再享受几秒钟的暂缓时间。 你瞧,亨利和妈妈在演着一场独幕剧;双方都知道剧规,知道对方扮演的角色。 全场戏程序化,计算机化,并按脚本进行。
0 周岁被保险人累计重大疾病风险保额大于 10 万元时,按照重大疾病体检项目( A+B+腹部 B超)体检(同时参照寿险体检项目,以两者项目多者为准)。 不足上述额度时,按寿险体检项目规定执行。 2. 两全保险的体检规定 对于单独投保两全保险,被保险人投保额度达到体检规则要求 若同时满足以下两个条件,可以免除体检: (1)被保险人健康告知无异常; (2)被保险人投保两全保险的寿险净风险保额小于 1