设备检查概论内容摘要:
鹵素測 漏 (6)質譜儀測 漏 洩漏檢測 LT 不同測漏法靈敏度的比較 方 法 可測到最低洩漏率() 壓力變化測漏 與時間有關 超音波測漏 化學滲透劑測漏 104 氣泡測漏 105 鹵素測漏 1010 質譜儀測漏 1012 材質辨識 (PMI) 材質初步分析 (適用於合金鋼、不銹鋼 )以移動式分光儀為之。 唯受限於不能檢驗曲度過大之工件,且受檢面積需 50mm*50mm以上,方能便於用槍,又因其一經移動則需重新校正,加上裝備笨重不利高空作業。 目前已有多種 pmi儀器,使用同位素法輕巧方便。 真空試漏 位置: 底板焊道及母材部分或頂板焊道。 時機:考慮各項鋼板之腐蝕有洩漏時。 實施方式:在可疑位置塗上肥皂液或專用溶液,利用真空試漏箱緊壓此區域,真空開口邊緣與儲槽板之間放置一層軟的墊圈,經真空泵抽真空至少表壓負 4psig以上真空度,如有洩漏時,可由真空箱頂的玻璃看出有明顯的泡泡產生 Rapid Tube Inspection using Eddy Current (ET) or Remote Field (RFT) methods Characteristics of the ET technique High speed method. Inspects 500800, 10m tubes per day. 100% inspection of the tube. Little surface preparation (cleaning). Color coded reporting for convenient results overview. Heat exchanger Inspection Probe Signals produced by various amounts of corrosion thinning. Periodically, refinery plants are shutdown for inspection. Inspectors feed eddy current probes into heat exchanger tubes to check for corrosion damage. Pipe with damage Manual Ultrasonic (UT) Weld Inspection Quick and direct results. No protection against radiation required, neither interruption of other peoples work. Inservice inspection. Inspection of plex geometry welds with profile analysis of the weld using a PC. Inspections performed according to international standards ASME, EN etc. Final technical report that contains position, depth and type information of discontinuity. Storage of the discontinuities signals and inspection parameters. Sensitivity in critical discontinuities detection (. cracking). Automated Ultrasonic (UT) Tube Corrosion Mapping Inspection speed up to 100mm per second, depending on the desirable resolution. The probe for data recording is inserted pletely automated with a 300mm per second speed depending on the required measurement precision. Complete 2 or 3 axes recording (CScan and BScan) with capability to export the data on Excel worksheet for further analysis. Inspects tubes with diameters from 12mm up to 76mm. Thickness and corrosion mapping and/or inspection for other types of imperfections. Ultrasonic Thickness Measurements Quick measurements with direct results. High precision measurements. The inspected object can be inservice. No particular surface preparation required. Measurements can be made without removal of the paint. Measurements on high temperature surfaces possible Guided Ultrasonic Waves Pipe Inspection A ring with the transducers is placed around the pipe No couplant is required Usually no surface preparation required Instrumentation is fully portable Guided waves are sent in each direction Data are collected and stored in the portable instrument Reflections are analysed and results。设备检查概论
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
设想你走在放学回家的路上,突然间狂风大作,电闪雷鸣,
人的瞳孔也能这样调节的。 △ 猫能通过调节瞳孔的大小使自己在明处和暗处都能看清物体。 在亮处 在暗处 三、什么是近视眼。 可配 戴什么镜矫正。 正 常 眼 远处物体反射的光线经过晶状体的折射后形成的物像落在视网膜上 近 视 眼 晶状体曲度过大或眼球前后径过长使物像落在视网膜的前方 近视 矫正 凹透镜 正 常 眼 远处物体反射的光线经过晶状体的折射后形成的物像落在视网膜上 远 视 眼
论校本课程的资源开发
g)2 2NH3(g) △ H=- 92. 6kJ/moL。 实验测得起始、平衡时得有关数据如下表: 容器编号起始时各物质物质的量 /mol达平衡时体系能量的变化 N2H2NH3①130放出热量: 23. 15kJ② 0. 92. 70. 2放出热量: Q 下列叙述错误的是 ( ) A.容器①、②中反应的平衡常数相等 B.平衡时,两个容器中 NH3的体积分数均为 C.容器②中达平衡时放出的热量
设备资产管理系统使用指南
览 ” , 点 “ 回到列表处 ” (请别选 “ 下一步 ” ) 选择预约 预约安排 选择时间、选择校区 预约 打印报销确认单 ,让您所在设备资产帐户管理员审核发票,在发票和预约单上加盖管理员章(正方形新章,老章已废止),就可以去财务柜面报销。 您也可选择到实验室处办公点(具体地址见附件)审核发票、盖资产章。 设备资产在线建账 若您递交的建账申请有误,您可重新递交