英语教学理论与实务内容摘要:
l reading curricula with more traditional instructional processes. In general, the results show superior performance by the CIRC classes on standardized achievement tests, writing samples, and oral reading inventories. Similar effects were seen with the sub population of mainstreamed students found in the classrooms involved in these studies. Every evening, students are asked to read a book of their choice for at least twenty minutes. Parents initial forms indicating that students have read the required time, and students contribute points to their teams if they submit a pleted form each week. Students plete at least one book report every two weeks, for which they also receive team points. If students plete their story activities or other activities early, they are encouraged to read their independent reading books in class. . Text in here Independent Reading(2) 1) Make groups consist of 4 members heterogeneously 2) Teacher give text with of topic learning 3) Students cooperate read to each other, find main idea, and give opinion to text. At the end, the students write the result on the paper. Rachmad Widodo describes the steps of this method. The steps are: e. The Step of CIRC Method(1) 4) Make presentation or read to the result from group’s discussion 5) Teacher and Students make summary together closing. Rachmad Widodo describes the steps of this method. The steps are: e. The Step of CIRC Method(2) B. Previous Researches • Definition of Cooperative Integrated Reading and Composition (CIRC) • Cooperative integrated reading and position (Slavin, Robert E,amp。 Nancy A. Madden。 et al,1996) is a prehensive reading and writing program that includes storyrelated activities, direct instruction in reading prehension, and integrated reading and language arts activities. In this study CIRC method is a teaching method that be used to improve students’ ability in posing narrative writing in order to make classroom situation more interesting. B. Previous Researches Thesis entitled “Cooperative Integrated Reading and Composition as a Method to Reduce The Students’ Problem in Writing a Recount Text (A Classroom Action Research at 8th grade, MTs Husnul Khatimah Semarang in the Academic Year of 2020/2020)” Method to Reduce The Students’ Problem in Writing a Recount Text”, Final Project of Tarbiyah Faculty, (Semarang: Walisongo State Institute For Islamic Studies, 2020), Unpublished. The resea。英语教学理论与实务
相关推荐
order, sing, save, spare等。 16 (主语 +及物动词 +间接宾语 +直接宾语 ) 扩展和修饰 • Grandma told me a story. • As expected, Grandma told me a story . • Grandma told me a story for the purpose of cheering me up. • Grandma
案例分析 Book 1, Module 12, Unit 1, I like football. “I like/don’t like football/basketball/ table tennis/morning exercises。 ” 案例分析 语言教学内容一般包括语音、词汇、语法(句型)。 四种运动属于词汇教学内容,需要一定操练。 可以借助语法知识对过去内容进行操练。 新句型
o e early? C. Isn’t it a marvelous film? Pretest: 1. Somebody phoned while I was out, ____? 2. Bob rarely got drunk, _did he___? 3. There ’s no help for it, __is there__? 4. I’m late, ____I? 5. I
诗歌 6二国文 6, 生物学 8,经济学 6, 西洋通史 6,逻辑 6一课程(学分)年级西南联大英国文学系课程1928 年清华大学西洋文学系课程安排8选英文 +第四年德 /法文 8,西洋文学史分期研究 4[十八世纪,十九世纪) ],文学各体研究 4(诗歌 /戏剧),文学专项研究 4(伊利萨博时代之抒情诗 /感情派戏剧 /心理分析派小说 /文学中之写实主义及自然主义 /文学批评论文等),专集研究