ccnaicnd40s02l(编辑修改稿)内容摘要:
ICND—226 Physical Layer: Ether/ Hub Hosts Host 10Base2—Thick Ether 10Base5—Thick Ether 10BaseT—Twisted Pair ICND—227 A B C D Physical • All devices in the same collision domain • All devices in the same broadcast domain • Devices share the same bandwidth Hubs Operate at Physical layer ICND—228 Hubs: One Collision Domain • More end stations means more collisions • CSMA/CD is used ICND—229 Defines • Physical source and destination addresses • Higher layer protocol (Service Access Point) associated with frame • Network topology • Frame sequencing • Flow control • Connectionoriented or connectionless Data Link Physical EIA/TIA232 Data Link layer Functions ICND—230 Data Source add FCS Length Dest add Variable 2 6 6 4 Vendor assigned IEEE assigned MAC Layer Data Link Layer Functions (cont.) Preamble Ether II uses “Type” here and does not use . MAC Address 8 Bytes ICND—231 • Each segment has its own collision domain • All segments are in the same broadcast domain Data Link Switches and Bridges Operate at Data Link Layer OR 1 2 3 1 2 4 ICND—232 Switches • Each segment has its own collision domain • Broadcasts are forwarded to all segments Memory Switch ICND—233 • Defines logical source and destination addresses associated with a specific protocol • Defines paths through work • Interconnects multiple data links Network IP, IPX Data Link Physical EIA/TIA232 Network Layer Functions ICND—234 Data Source address Destination address IP Network Layer Functions (cont.) Header Node Network • Logical Address Netw。ccnaicnd40s02l(编辑修改稿)
相关推荐
00a rc t a n)( Qid)相频特性 图 (a) 相对幅频特性 当 时, ; 当 时, 随着 偏离 而减小,减小的速度(斜率)则随 值增加而加大 0 1)( i0 )(i 0Q当 时,回路呈阻性;当 时,回路呈感性;当 时,回路呈容性。 Q值越高,相频曲线的斜率越大,单位频率变化引起的相位变化也越大, 0 0 0
for maturities T1 and T2 are R1 and R2 with both rates continuously pounded. • The forward rate for the period between times T1 and T2 is R T R TT T2 2 1 12 1Options, Futures, and Other Derivatives
)( ppKsKsT)(( 2)二阶 PLL 理想积分滤波器 2221 2)()()(nnee ssssssT22 2)(nne ssss1)1s i n h11( cos h1)1(1)1s i n11(
人力资源管理(考核激励类)技术人员能力考核表 业技术高超 能准确执行上级指示责任感极强 有良好的技术素质和创新能力能随机应变人事协调力好 熟练掌握技术 能遵守上级指示有一定的技术创新力 正确掌握技术 有进取心 能随机应变 勉强能完成任务 技术能力一般 满分 15分 15 分 1412 分 119 分 86 分 5 分以下 满分 10分 10 分 98 分 75 分 54 3 分以下 满分 5 分
amily Life Cycle Stage Lifestyle Occupation amp。 Economic Circumstances Personality amp。 SelfConcept 169。 20xx Prentice Hall Psychological Factors Perception Learning Beliefs amp。 Attitudes
22:00 销售 乐队将现场气氛推向高潮 灯光、音响配合 活动执行 • 20xx年 4月 26日 时间 内容 乐队配合 AV 配合 白天 销售 零星演出 配合乐队 18:00— 18:30 宣传闪亮之星活动 闪亮之星获奖乐队登场亮相 闪亮之星校园活动视频回放 18:30— 19:30 销售 闪亮之星华北区决赛资格乐队演出 配合乐队 19:30— 20:30 销售 抽奖活动、乐队演出 配合抽奖