网络地址翻译networkaddresstranslation内容摘要:
复用 (PAT) 端口复用的特征是内部多个私有地址通过不同的端口被映射到一个公网地址, Overloading, or Port Address Translation (PAT), maps multiple private IP addresses to a single public IP address. Multiple addresses can be mapped to a single address because each private address is tracked by a port number. 理想状况下,一个单一的 IP地址可以使用的端口数为4000个。 Realistically, the number of ports that can be assigned a single IP address is around 4000. NAT分类( NAT Class) 169。 2020, Shenzhen Polytechnic. All rights reserved. 13 PAT特征( PAT Features) 169。 2020, Shenzhen Polytechnic. All rights reserved. 14 配置 NAT (Configuring NAT) 169。 2020, Shenzhen Polytechnic. All rights reserved. 15 静态 NAT配置实例 (Static NAT Example) 169。 2020, Shenzhen Polytechnic. All rights reserved. 16 静态 NAT配置实例 (Static NAT Example) r1(config)ip nat inside source static r1(config)ip nat inside source static r1(config)interface f0/0 r1(configif)ip nat inside r1(config)int s0/0 r1(configif)ip nat outside 169。 2020, Shenzhen Polytechnic. All rights reserved. 17 静态 NAT配置实例 (Static NAT Example) r1 debug ip nat IP NAT debugging is on 00:11:09: NAT: s=, d= [40936] 00:11:09: NAT*: s=, d= [40936] 00:11:10: NAT*: s=, d= [40938] r1 sh ip nat translations Pro Inside global Inside local Outside local Outside global。网络地址翻译networkaddresstranslation
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。