纳米技术在军事上的运用内容摘要:

n carry out the bat missions under the situation that a lot of equipments are carried, such as night vision equipment(夜视仪) and other equipments. The kind of uniform is bulky, airtight(密闭) and unfortable, restricting the ability of US Army. However, nano uniform just can solve these problems. Five Major Characteristics: Light: excellent ventilation(透气) function. Intelligence Computerization: micro puter with nano bulletproof helmet. Protection Function: High strength and toughness. Function of Treatment: Expansion and contraction of material. Function of Stealth: perception of ambient colors. Manufacture of Miniature Weapons • Principle: Nanotechnology can concentrate sensor, motor and digital intelligent equipment on one chip, creating a few centimeters or even smaller miniature device. Micro actuator(微型执行机构) and other parts which are made by nanotechnology, such as nano wheel, nano spring, nano nozzle(喷嘴) , nano bearing(轴承) , microsensor, can be made into a series of new products. • Application: The United States developed small intelligent robots. Some of them are as big as shoe boxes, the others are as small as coins. They can crawl(爬行) , jump even fly over minefields(雷区) , across the desert or the beach, collecting information for army or headquarters lived thousands of kilometers. Micro mechanical weapons can also be used for Identification of Friend or Foe, detection of nuclear pollution(核污染) and chemical agents(化学毒剂) , unmanned reconnaissance aircrafts(无人侦察机) and so on. Manufacture of Micro Satellite and Nanosatellite • Features: Special minature inte。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。