第十五章网络地址转换内容摘要:

动态 NAT配置命令 • Establishes dynamic source translation, specifying the access list defined in the prior step Router(config)ip nat inside source list accesslistnumber pool name • Defines a pool of global addresses to be allocated as needed Router(config)ip nat pool name startip endip {mask mask | prefixlength prefixlength} • Defines a standard IP access list permitting those inside local addresses that are to be translated Router(config)accesslist accesslistnumber permit source [sourcewildcard] 169。 1999, Cisco Systems, Inc. ICND— 815 动态 NAT配置实例 169。 1999, Cisco Systems, Inc. ICND— 816 PAT配置命令 • Establishes dynamic source translation, specifying the access list defined in the prior step Router(config)ip nat inside source list accesslistnumber interface interface overload • Defines a standard IP access list permitting those inside local addresses that are to be translated Router(config)accesslist accesslistnumber permit source sou。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。