短文改错解题微技巧内容摘要:

5. The man is sitting next his son. 6. I’m sorry, and I won’t be able to e tonight . 7. We may be one family and live under a same roof. is 动词 形 time 名词 数 careful 还要注意 形和副 us 代词 格,细领悟 to 介词 短语须关注 but 冠词 连 词常光顾 the 冠 词连词常光顾 【 2020年新课标 II】 ( 5 mins ) Practice makes perfect。 The book I’m reading of talks about afternoon tea in Britain. It is said to have started in the early 1800’s. Have tea in the late afternoon provides a bridge between lunch and dinner, that might not be served until 8 o’clock at night. This custom soon bees another meal of day. Interesting, it had a connection by the British porcelain(瓷器 ) industry. Tea in China was traditionally drank from cups without handles. When tea got popular in Britain, there was a crying need for good cup with handles to suit British habits. This made for the grow in the porcelain industry. The book I’m reading of talks about afternoon tea in Britain. It is said to have started in the early 1800’s. Have tea in the late afternoon provides a bridge between lunch and dinner, that might not be served until 8 o’clock at night. This custom soon bees another meal of day. Interesting, it had a Having which the became Interestingly 介词 短语须关注 非谓语 还要注意 形和副 冠 词 连 词常光顾 冠 词 连 词常光顾 动词 形 connection by the British porcelain(瓷器 ) industry. Tea in China was traditionally drank from cups without handles. When tea got popular in Britain, the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。