眩晕dizzinessandvertigo内容摘要:

ither one first according to the condition of the dizziness. 取足厥阴、少阳、少阴经穴为主。 毫针刺,补泻兼施,以平肝滋阴潜阳。 处方 Prescription  Fengchi风池 (GB 20), Xingjian 行间 (LR 2), Taichong太冲 (LR 3), Taixi太溪 (KI 3), Sanyinjiao三阴交 (SP 6) Deficiency of Qi and Blood :  Main Manifestations  Dizziness acpanied by weakness, pale face and pale lips, palpitation, insomnia, tongue proper is pale, pulse is thready and weak, loss of consciousness happens in severe cases. 主症 眩晕而乏力懒言,面色晄白,唇甲不华,心悸少寐,舌质淡,脉细弱,甚则眩晕昏倒,劳累即发 Treatment  The points of Governor Vessel, Conception Vessel, Spleen and Stomach Meridians are selected as the main point with rein。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。