激光的特性laseroutput-beroperties内容摘要:

, highly stable, singlefrequency sine wave, exactly like the signal generated by a highly stable electronic oscillator in any other frequency range. • The term coherence necessarily refers not to one property of a signal at a single point in space and time, but to a relationship, or a family of relationships, between one signal at one point in space and time, and the same or another signal at other points in space and time. • More colloquially, a signal is called “temporally coherent” if there is strong correlation in some sense between the amplitude and/or phase of the signal at any time and at earlier or later time. • Both the amplitude and the phase of a goodquality laser oscillator will in fact change only slowly with time, so that the amplitude and the phase of the output sine wave from the laser at any one time will be strongly correlated with the amplitudes and phases at considerably earlier or later times. A goo。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。