推行新修订的学前教育课程指引系列:1课程规画与施行内容摘要:

ouse with furniture / a doctor’s kits / a puppet theatre with hand puppets  Require sufficient space for children to use the same toy either in small group or on his own = four play spaces (when calculating the plexity of the play environment) Units of Play (Simple, Complex, Super Units)  Super units  having one or more additional play materials  . a toy shelf stocked with grocery boxes and tins, and paper bags  . adding blankets and tables to the playhouse = eight play spaces (assuming the space in which the super unit is set up can house eight children) Example  a 1metresquare water table with jugs amp。 plastic bottles  string painting at a round table for four  4 singlesided easels  a small listening centre with 2 headsets  a climber with slide, firefighter’s pole, and helmets  a table and 4 chairs with a tea set  one set of unit blocks with wooden accessories  4 hoops  a bean bag target toss with four bean bags Shipley, D. (1993). Empowering children: Playbased curriculum for lifelong learning. Nelson, Canada: Thomson Canada Limited. Remended number of play spaces (per child/per 20 minutes) 18 to 30monthold。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。