实验4:光的折射、偏振、干涉和绕射lab4-refraction,内容摘要:
er beam path. PhysicsNTHU MFTai戴明鳳 Class 4 Lasers 1. Enclose the entire laser beam path if at all possible. If this is done, the laser device could be considered to be a less hazardous classification. 2. Confine indoor laser operation to a lighttight room with interlocked entrances to assure that the laser cannot emit when a door is open. 3. Insure that all personnel wear adequate eye protection, and if the laser beam irradiance represents a serious skin or fire hazard that a suitable shield is present between the laser beam and the any persons in the room. 4. Use remote firing and video monitoring or remote viewing through a laser safety shield where feasible. 5. Use beam traverse and elevation stops on outdoor laser devices to assure that the beam cannot intercept occupied areas or intercept aircraft. 6. Use beam shutters and laser output filters to reduce the laser beam irradiance to less hazardous levels whenever the full beam power is not required. 7. Assure that the laser device has a keyswitch master interlock to permit only authorized personnel to operate the laser. 8. Install appropriate signs and labels on entrances, switches and anywhere an unauthorized person might mistakenly activate the laser. 9. Remember that optical pump systems may be hazardous to view and that once optical pumping systems for pulsed lasers are charged, they can spontaneously discharged, causing the laser to fire unexpectedly. dark, absorbing dif。实验4:光的折射、偏振、干涉和绕射lab4-refraction,
相关推荐
and flagella. Simple stains 革兰氏染色 Gram Stain developed Christian Gram in 1884 The gram stain is the most widely used staining procedure in bacteriology. It is called a differential stain since it
试管菌种: 大肠杆菌、 产气肠杆菌、枯草杆菌等 试剂: 生理生化反应管、酵母粉 (市售 ), 葡萄糖 器材: 显微镜 擦镜纸 接种环 载玻片 吸水纸 试管 小滴管 酒精灯 操作程序 菌种的准备 :对不同菌种进行纯化; 生理生化反应管的准备: 预备好成套的生理生化反应管,最好每人一套
最明亮、均匀。 如靠近光源,可用平面反光镜,如距离光源较远,可用凹面反光镜。 3)装片:将洋葱鳞叶临时标本片放置于载物台上,用夹持器固定并移动标本片,使所观察材料正对载物台通光孔中心 . 4)调焦观察:在低倍镜下,侧视旋转粗调焦手轮,上升载物台或下降镜筒至距物镜约 1cm处(此时制片接近物镜,但不接触物镜),双眼张开并目视目镜,再缓缓上下调节粗调焦手轮,直至视野中出现清晰的物像为止
调节法调节,具体调节方法如下: 注意:望远镜调节水平后,螺丝 d千万不能再转动,否则重新调节 载物台转动 180176。 ( b) 打开狭缝 , 从望远镜中观察 , 同时调节平行光管狭缝与透镜间距离 , 直到看见清晰的狭缝像为止 , 然后 调节缝宽 使望远镜视场中的缝宽约为 1mm. ( a) 目测粗调 至平行光管光轴大致与望远镜光轴相一致. ( d) 消除视差
络实验 12 实验说明 注 1: 查看在本地连接属性中配置添加协议: NWLINK IPX/SPX/NETBIOS… . 注 2:如何避免多余报文的干扰 将本地连接属性中的协议减少为最必要的: Microsoft网络客户端 Microsoft网络文件和打印机共享 TCP/IP 北航计算机网络实验 13 网络协议分析 以太网链路层报文格式 VLAN的基本配置 VLAN间通信
9 5 23 蓝天 14 9 5 23 雄鹰 14 7 7 21 远大 14 7 7 21 卫星 14 4 10 18 钢铁 14 0 14 14 问题 2: 有人说:在这个联赛中,有一个队的胜场总积分等于它的负场总积分。 你认为这个说法正确吗。 试用方程的知识说明理由。 分析: 我们可以暂且当这个结论是正确的,看看我们能从中得出什么结果。 这个结论是否正确,要看结果是否符合实际意义。