动词的时态的复习内容摘要:

过去进行时。 故选 D。 D 【 例 4】 ( 2020盐城 ) Mr. White came to our school in 2020, and since then he ________ us English. A. teaches B. taught C. has taught D. will teach 解析:本题考查现在完成时的用法。 since then意为 “ 从那以后到现在为止 ” ,句中的时态为 现在完成时。 故选 C。 C 【 例 5】 (2020枣庄 ) He said that light ________much faster than sound. A. has travelled B. went C. travels D. travelled 解析:本题考查一般现在时的用法。 在宾语从句中尽管主句的时态为过去时,从句若表示 真理则仍用一般现在时。 C 【 例 6】 (2020北京 ) Where’s Tom? His mother ________ him now. A. is looking for B. will look for C. has looked for D. looks for 解析:本题考查现在进行时的用法。 now为关键词,意为 “ 现在 ”。 常与现在进行时连用。 故选 A。 A 【 例 7】 (2020河北 ) My sister wants a new dress. She ________ it to the party. A. wears B. has worn C. wore D. is going to wear 解析:本题考查一般将来时的用法。 根据句意:我的姐姐想要一条新裙子,她打算穿着它去 参加晚会。 判断 is going to wear 符合逻辑。 故选 D。 D 【 例 8】 (2020宿迁 ) If there is any change to the plan, I ________ you as soon as possible. A. told B. have told C. tell D. will tell 解析:本题考查一般将来时的用法。 根据上文: “ 如果我有机会 ” ,可知还未发生。 须用一般将来时。 故选 D。 D 领悟语法 Ⅰ . 用方框中所给词的适当形式填空 travel do not leave write visit 1. —Can I help you? —I bought the pen yesterday. But it work. 2. She told us she the Summer Palace the next day. 3. He told me he a letter to his pen pal when I called him. 4. They for England tomorrow. 5. My father told me the light faster than the sound. doesn’twould visit was writing are leavingtravelsⅡ . 单词拼写 (1)If it isn’t (下雨 ) this Sunday, we will go hiking. (2)The Greens have (去 ) to Beijing twice. (3)He (买 ) this car for three years. He (买 ) it in 2020. (4)There will (有 ) a new library in our town next year. (5)The talk show (开始 ) at 8∶ 00 tomorrow evening? rainybeenhas had bought be will startⅢ . 单项选择 ( )1. —Are you going to the bank, Laura? —No, I ________ to the bank already. (2020徐州 ) A. have been B. have gone C. am going D. had been 解析:考查时态及句意。 由上句句意 “ …… 你打算去银行吗。 不。 ” 和 “ already”推 测他已经去过了,用现在完成时。 have/has been+地点 意为 “ 去过某地 (已回来 )”; have/has gone+地点意为 “ 到 某地去了 (现在不在这儿 )”。 故选 A。 A ( )2. I ________ along the road when I saw Peter. So we stopped and had a chat.(2020盐城 ) A. walked B. was walking C. would walk D. had walked 解析:考查时态。 过去进行时与 when连用表示:过去正在发生某事, 突然插入一个时间点。 句意:我在沿马路上走的时 候看到了彼得。 因此我们停下聊了起来。 故选 B。 B(。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。