仁爱英语八上u1topic1内容摘要:
…on :你愿意和我们一起去野餐吗 ? 当然 ,我很愿意。 Would you like to go for a piic with us? Sure, I’d love to . sport do you prefer, cycling or rowing? I prefer rowing. prefer doing sth. to doing sth. 宁愿做某事也不愿做某事 prefer to do sth. rather than do sth. +组织 join + 人 , “加入某人行列或与某人一起 join in +活动 , 表示参加某项活动 , 相当于take part in + 活动 译 :我们应该积极参加户外活动。 We should take an active part in outdoor activities. 译 : 她入团两年半了。 She has been in the League for two and a half years. She has been a league member for two years and a half. She joined the League two and a half years ago. It’s/ It has been two and a half years since she joined the League. Two and a half years has passed since she joined the League. : 1)姚明身高。 Yao Ming is meters tall. 2)当我长大的时候我打算要成为一名像姚明那样的篮球运动员。 I’m going to be a basketball player li。仁爱英语八上u1topic1
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
今天我有很多的感触,看到学生作业错误一大片同时上课的
事,课间,别的老师可以休息一会,我不是有学生来问题,就是有学生来背诵英语;下学了,别的老师都回家了,我还在给学生一遍又一遍的讲题,总要在孩子一次又一次的催促中才能回家;星期天,别的老师在家休息,我却总是牺牲休息的时间,无偿的给学生补课。 家务活要晚上做,衣服要晚上洗,就连孩子的饭都保证不了按时做好。 特别是到了
仅仅用了三年的时间,就在20xx年3月23日成功登陆纽交所
第一季结束后,微単里 1490多万粉丝和全国数亿观众突然感觉到,没有了张亮癿周末好像少了点什么。 在百度张亮吧有网友自发提出 《 集齐 326个请愿,要更多看到张亮、亮到晃眼 》 癿喊话,强烈地表达了“要求振锁多拍节目和广告”癿诉求。 而在新浪微単,粉丝们也联合发起了 没有张亮癿周五看广告 癿热门话题,呼吁广告商给张亮更多广告露出。 更有粉丝在得知张亮成为唯品会品牌形象大使、领衔每周五晚
今天,老师这里有几幅漂亮的画,不是用纸和笔画的,请大
二、让学生观察窗口界面 ,逐渐引导学生认识 菜单栏、标题栏、工具栏、绘图区、调 色板等等。 菜单栏 标题栏 工具栏 绘图区 调色板 三、将学生分成几个小组,分别摸索和探讨其他工具的使用,派代表当小老师 介绍演示,让他们自己得出结论 四、老师讲解演示如何填充颜色 任务下达 • 师: “ 同学们以 ‘ ’ 这一作品为参考,画出你想象中的小家。 看哪些同学画的又快又好,下课后我们将优秀作品打印张贴出来
仁爱英语八下uni5重点短语,句子,语法
because of the noisy children. did you e here for ? time flies! = How quickly the time flies! seems to be the problem? feels very lonely because she has no friends to talk with. was not used to