unit8internationalconference内容摘要:

 1. What you’ve done.  2. Methods introduced briefly  3. Findings/discovery  4. Conclusion Informative abstract  It gives as much important information as can be crammed into the word limit.  It also give specific information about problems , method, result, or conclusion. Descriptive abstract  It describe reports. It doesn’t give any specific information about the problem, method, result, or conclusion. Sample of Descriptive abstract  The purpose of this program is to provide generalized crack growth tracking procedures for transport bomber aircraft. A study and tests were conducted on crack growth rate characteristics, analysis schemes were developed, and tracking procedures were evaluated. Sample of informative abstract  This paper explores the history of one pany and its bid for survival in the rapidly changing world of today.  It examines the plastics industry in America and the position of the pany within it, detailing the growth of the pany over the past 50 years and the expansion of the product range and facilities to the present time. Analysis of two translated versions  Orius sauteri (Poppius) is a predator with facultative reproductive diapause. It has。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。