unit32thingsgowrong内容摘要:

em driving off. see sb. doing/do sth. 看见某人做某事 p193 我看见他在旅店订房。 I saw him booking a room in a hotel.  What the car or van was like.  thieves were disturbed by my neighbours. My neighbours disturbed the thieves. 2. Quite a lot of damage was done (by the thieves). The thieves did quite a lot of damage. 3. The study door was kicked in (by the thieves). The thieves kicked in the study door. 4. They were contacted by Mr. Timson… Mr. Timson contacted them. 主动语态:主语 +谓语动词 +宾语 被动语态: 主语 (宾语 )+be done(动词的过去分词 )+ by sb. (主语 ) Session III  When was this discovered? discover, find 发现  It looks like the work of Larry Hipkin.  especially as your neighbour saw them leaving.  as。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。