thelimitsofus内容摘要:
Simultaneously, 20 percent of the pla’s bird species have been driven into extinction, 50 percent of all freshwater runoff is consumed, 70,000 synthetic chemicals have been introduced into the environment, the sediment load of rivers has increased 5 times, and more than 65 percent of the major marine fisheries on the pla have been fully exploited or depleted. 与此同时, 地球上百分之二十的鸟类濒临绝种, 百分之五十的淡水都已耗尽, 70, 000 种合成化学制品被引入自然环境中, 河流的沉淀物增加了五倍, 地球上百分之六。thelimitsofus
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。