texasinstrumentsdigitalaudio内容摘要:
Amplifier TI Digital Amp Gives More Audio With Less Heat Easier layout – audio remains digital so no fine tuning in analog is required – TI Digital amp SNR up to 110dB PWM processor can do volume control/ equalization/bass management and more! 90% efficiency reduces or eliminates need for heat sink Power amp。 Integration Digital Amplifier Power Stages Up to 50W @6Ω 2 Ch Up to 100W @ 4Ω 1 Ch Released In development Product Proposals TAS511x TAS512x Future Products Existing Products Outputs are BTL unless noted. Please note that product proposals are still open for customer feedback and the definition may change. 2Ch 125W @ 4W 10% 36 PSOP 1Ch 125W @ 8W 6Ch (5x30W+1x60W) @ 10% 3Ch 70W @ 6W 10% 44 HTSSOP/PSOP Pin Compatible 2Ch 100W @ 4W 10% 4Ch 40W @ 3W 10% 44HTSSOP/36PSOP TAS5142 TAS5152 TAS5186 TAS5261 AIC23B Stereo DAC DVD Receiver with TAS5086/5186 System MCU Analog Line Input RCA S/PDIF Input(s) S/PDIF Headphones AM/FM Tuner R L LC DVD Control AIC23B Stereo ADC w/Mux TAS5086 MPEG Decoder (Decode, Tone, amp。 Bass Mgmt.) LC LC LC LC LC LT/RT IIS Out Line Output R L R L RS LS C Sub SData 13 TAS5186DDV SRAM SDIN Volume PWM Conv. CH Mux Dolby Downmix SCLK 48/64Fs LRCLK Valid/Reset HP Amp w/Vol Ctl. MCLK 64/128/192/ 256/384/512 Fs Sub Filtering SData4 LC Bias Out Digital Amplifiers for Full Range of Home Theater Systems TAS5518 8 Channel Equalization/volume/mixer/PWM TAS5086 6 Channel Bass/Volume Management/PWM TAS5504 4 Channel Equalization/volume/mixer/PWM TI’s Broad Spectrum of Audio Amps amp。 Processors Highquality digital audio processing TAS5518 48 bit data path/76 bit accumulators 110 dB performance Lossless bass management, pression Configurability for , or channel systems Treble, bass, loudness, parametric EQ Extensive power stage product line 15 to 125 watts per channel From costfocused to audiophilegrade Shipping today in $10,000 (USD) systems Shipping in $99 DVDRs MiniComponent Systems/MP3 Docking Stations PurePath Digital™ Perfect for Wireless Speakers System Decoder TI Digital Audio Processor Digital Amplifier Squeak Wireless Processor Squeak Wireless Processor Wirel。texasinstrumentsdigitalaudio
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。