technologyroadmapshsudarshan内容摘要:
Cat I/II/III SBAS LPV 200 B065 B165 NAVIGATION PBN EnRoute Oceanic and Remote Continental Migration path based on Region/States requirements EnRoute Continental Terminal Airspace: Arrival and Departure RNAV 1 Basic RNP 1 Advanced RNP RNP (Helicopter only) RNAV 5 RNAV 2 RNAV 1 Advanced RNP RNP (Helicopter only) RNP APCH (SBAS: LPV, BARO VNAV: LNAV/VNAV, Basic GNSS: LNAV) RNP AR APCH (where beneficial) Approach RNAV 10 (RNP 10) RNP 4 RNP 2 Block 1 Block 2 Block 3 Block 0 2018 2023 2028 RNP 2 Block 1 Block 2 Block 3 Block 0 Block 1 Block 2 Block 3 Block 0 2018 2023 2028 2018 2023 2028 Enabler Capability Surface MLAT ADSB In/Out (ICAO Ver. 2) Cameras B181 B075 B175, B115, B181 B275 SMGCS Level 3 and 4 SMGCS Level 1 and 2 GroundBased B075 B175, B115, B181 B275 SMR SURVEILLANCE B170, B175, B115, B181 Enabler Capability PSR B084, B0102 MultiStatic PSR B140 ADSB In/Out (ICAO Ver. 2) B040 B140 ADSC Groundbased surveillance B084 WAM SSR/ModeS B1102, B140 Enabler Block 1 Block 2 Block 3 Block 0 2018 2023 2028 ADSB In/ Out (ICAO Ver. 3) SSEP ASEP Airborne Spacing Application (ASPA) Interval management InTrail Procedures (ITP) AirAir Capability B085,B 086 B285 B175 ADSB In/Out (ICAO Ver. 2)。technologyroadmapshsudarshan
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。