symptomsofchyestdisorders胸部疾病的症状内容摘要:

Fever Chest pain Dyspnea amp。 wheezing Sputum production Complication(并发症) Cough syncope syndroma Fatigue Fractures due to severe persistent cough Pneumomediastinum, pneumothorax, and subcutaneous emphysema due to high intrathoracic pressure during cough. Chronic cough(3weeks):  postualnasal drip syndroma(鼻后滴漏综合征)  cough type asthma  smoker  Post URW infection  GERD Sputum expecteration (咳痰) Denote airway secretions being coughed out . Characters: mucoid, tenasious, purulent, blood stained, with special odor, rusty, serous Volume: Acpanied manifestation Special conditions Laboratory examination Rutine Microbiologic test ( including culture amp。 drug sensitivity) Cellular Hemoptysis (咯血 ) Blood originate below the level of the larynx that being coughed out. Usually bright red Degrees: fro。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。