spermwhale抹香鲸内容摘要:
water sperm whale is than a killer whale in its length. killer whale is than a sperm whale in its size. sperm whale has 50 teeth. It has more teeth than a killer whale. length of a sperm whale’s tooth is cm . longer smaller 10 20 ( ) yellow dog is taller than the black dog. (。spermwhale抹香鲸
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。