module2unit3project内容摘要:
for Socrates’ death Reasons philosophy introduction basis Task 4. Scan the text and answer the following questions. What do people think of Socrates? What was his special way of teaching? What is the basis of modern philosophy and science? Why did people take Socrates to court? What do you think Socrates’ contribution is? Two famous historical figures Introduction Body Conclusion Alexander the Great, the (1)_________ of Macedonia( 马其顿王国 ) , was considered as one of the greatest emperor in European history. Socrates, the (1)_______of Western philosophy, made great contributions to Western thought and science. Alexander the Great(356323BC), at the age of 20, became king. With many cities (2)_______________him, he led an army to take them back. In order to (3)_________the entire world, he marched his army in many directions and defeated every army (4)__________. By the age of 30, he had more land than anyone before. At the age of 33, he(5) ___________ a fever and died, after which his kingdom was (6)________by his generals. Socrates(469399BC)was from Athens, in Greece. When he was young, he was a brave soldier, then worked as a teacher for free and(2)_________。module2unit3project
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。