matchthewordsintheboxwiththeirmeanings内容摘要:

drivers respect the rules. C. The road going south from the capital is dangerous. D. It runs north from the capital , La Paz. Parts 23 has the death toll fallen ? 2. What happened to him when he was working as a lorry driver ? Because Timoteo worked as a human traffic signal to direct the traffic. He was driving a lorry load of bananas when he came off the road at a bend and fell three hundred metres down the mountain.  Find the words or phrases in the passage which mean: 1. A nearly vertical fall 2. A form of transport, especially one with an engine and four wheels 3. To still be alive, after being in an accident 4. The total number of dead ( an accident) 5. A part of the road which is not straight 6. To be used to something that you don’t see its true value and don’t show thanks 7. To make someone think hard 8. A reason f。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。