highereducationinusachinaaprivateuniversity内容摘要:

RI) FirstRate Engineering Education Comprehensive Programs 14 academic programs in 7 departments Education Beyond the Classroom Cooperative Education program with Industry 2 National Science Foundation REU Grants 40% of undergraduates work with a faculty member on research Excellent Worldclass Facilities $ Sears Undergraduate Circuits Lab EECS Virtual Worlds Gaming and Simulation Laboratory Microfabrication Laboratory Swagelok Center for the Surface Analysis of Material Wright Center Fuel Cell Labs 1,300 Undergraduate Students 600 Graduate Students Excellence in Research: Recent “Big Wins” Center for Layered Polymeric Systems (CLiPS) NSF Science and Technology Grant Up to $40M over 10 years Wallace H. Coulter Foundation Grant Supports Translational Research in BME $3M over 5 years Swagelok Center for the Surface Analysis of Materials $ Total ($2M to Case) Wright Center for Sensor Systems Engineering $ Total ($5M to Case) Excellence in Research: Energy for the Future 5kW fuel cell – Lynntech, Inc. Great Lakes Institute of Energy Innovation at Case Western Reserve University Research and Education: Team Case • Sensor fusion and interpretation • Competent decision making in ambiguous situations • Machine learning and . • Appropriate behaviors interacting with other vehicles and robots • Automated planning and dynamic replanning • Robust software engineering Autonomous Robotic Vehicle for DARPA Urban Grand Challenge Management and Engineering Education The Institute for Management and Engineering (TiME) •Masters degree that integrates engineering and management •Joint Program between School of Engineering and Weatherhead School of Management •Development of a new Masters degree program in Managing Science and Technology •Modular program offered at locations around the world. Globalization in Academics • Industries are global • Economies are interdependent • New countries/regions on the rise • “Internationalization” of the student experience is needed • Universities in these regions will advance to meet the industrial needs • To remain petitive universities need to have a global presence Case School of Engineering seeks global collaboration and exchanges An Example of Academic Administration at Case Hierarchy Structure • President校长 and Provost教务长 • Dean院长 and Department Chair系主任 Focus of President amp。 Dean external amp。 strategic • Fund raising, strateg。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。