femtocellintroduction内容摘要:

ronization, and backhaul  Voice femtocells  Interference management in femtocells, allowing access to femtocells, handoffs, mobility, and providing Emergency 911 services  Network infrastructure  Securely bridging the femtocell with the operator work over IP Technical Challenges - Broadband Femtocells (1/4) 18  Two main problems operators face: mitigate RF interference, efficiently allocating spectrum  The RF interference will arise from:  Macrocelltofemtocell interference (nearfar effect)  Femtocelltofemtocell interference  Femtocelltomacrocell interference (nearfar effect) Technical Challenges - Broadband Femtocells (2/4) 19  Challenge 1: How Will a Femtocell Adapt to Its Surrounding Environment and Allocate Spectrum in the Presence of Intra and CrossTier Interference?  Since femtocells will be placed by end consumers, the ad hoc locations of femtocells will render centralized frequency planning difficult  Decentralized spectrum allocation between macrocell and femtocell users is an open research problem  Should macrocell and femtocell users be orthogonal through bandwidth splitting? As 3GPP LTE and WiMax  Alternatively, with shared bandwidth  Which of these two schemes is “better” in various configurations? Technical Challenges - Broadband Femtocells (3/4) 20  Challenge 2: How Will Femtocells ProvideTiming and Synchronization?  Synchronization  Align received signals to minimize multiaccess interference  Macrocell users can handoff to a femtocell or vice versa  Timing  Immune to packet jitter  Network solutions such as the IEEE1588Precision Timing Protocol over IP and selfadaptive timing recovery protocols(. ) are promising  Equip femtocell with GPS(synchronized with the macrocell)  Highprecision ovencontrolled crystal oscillators may be used Technical Challenges - Broadband Femtocells (4/4) 21  Challenge 3: How Will Backhaul Provide Acceptable QoS?  IP backhaul needs QoS for delaysensitive traffic and sufficient capacity  Lack of neutrality poses a serious concern  Another issue: when users employed WiFi, femtocells experienced difficulty transferring data and even lowbandwidth services like voice[5] [5] Presentations by ABI Research, Picochip, Airvana, , Gartner, Telefonica Espana, 2nd Int’l. Conf. Home Access Points and Femtocells。 Technical Challenges - Voice Femtocells (1/6) 22  Two choices:  Allocate different frequency bands to macrocell and femtocell users  Eliminate crosstier interference  Serve both macrocell and femtocell users in the same region of bandwidth (preferable)  Maximize area spectral efficiency Technical Challenges - Voice Femtocells (2/6) 23  Challenge 4: How Will Femtocells Handle CrossTier Interference?  CDMA works (without femtocells) employ fast power control to pensate for path loss, sh。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。