exchangeserver20xx的owa内容摘要:
– Ensures clientserver affinity even when client IP changes • HTTP Compression: GZIP – ISA2020 can depress (to analyze pressed traffic) and press (to offload pression from web servers) HTTP traffic • Link Translation – ISA municates Link Translation to OWA: Intra links in OWA are translated to corresponding Inter links – Works when the linked Intra site is published to the Inter through the same ISA array publishing OWA • Improved PreAuthentication in Perimeter work 13 Exchange 2020/2020共存 • CAS 部署首要規則 –更優先建置 CAS 伺服器,先於 BackEnd/Mailbox (BE/MBX) 的升級、建置 • CAS 可使用為 Exchange 2020/2020 BE/MBX 的前端存取位置 – OWA and WebDAV 透過 /exchange, /public 與 /exchweb 都會運作 • Exchange 2020 Mailbox server 以 /exchange 與 /public 提供 WebDAV 存取 14 行事曆的改善、排程助理員 會議邀請、資源的使用與設定 OWA 2020 15 Exchange 2020 RTM會調整的部份 • 公用資料夾的介面 • 規則設定的介面 • “月 ”行事曆檢視 • S/MIME – will support reading clearsigned messages, but not sign/encrypt/dec。exchangeserver20xx的owa
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。