bridion174-sugammadex内容摘要:
4。 [package insert]. Bridion174。 Sugammadex Dosing Information • Dosing: • 24 mg/kg IV bolus based on actual body weight depending on blockade status • Immediate Reversal: 16 mg/kg IV bolus based on actual body weight • This dose has only been studied for rocuronium reversal Bridion174。 [package insert]. Bridion vs. neostigmine reversal agent for NMB induced by rocuronium or vecuronium at reappearance of T2 (Moderate Blockade) Eur J Anaesthesiol 2020。 18:99 • Purpose: Comparing the efficacy of sugammadex with neostigmine given with glycopyrrolate or atropine in antagonizing block produced by aminosteroidal NMBAs • Design: • Randomized, singledose, activecontrolled, safetyassessor blinded trial of 98 patients • Sugammadex μg/kg plus glycopyrrolate 10 μg/kg were administered intravenously in randomized order Blobner M, et al. Eur J Anaesthesiol. 2020。 18:99. • Included: Adult patients scheduled for surgery under general anesthesia in the supine position • 18 years old • ASA class 1 to 3 • Primary oute: Recovery time after reversal agent administration • measured as train of four。bridion174-sugammadex
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。