ancientgreekliteratue内容摘要:
Medea about to kill her children One Great Comedian Aristophanes Clouds: To satirize Socrates and the Sophists. Strepsiades sent his son to Socrates’ Thinkery. How far can a flea leap? Where does a gnat’s hum e from? Frogs: To criticize Aeschylus, Sophocles, and Euripides. An attack on Athenian political and literary decadence. Dionysus with Xanthias went to Hades to bring back a good tragedian. Lysistrata : A sex strike to end the Peloponnesian war Other Greek Writers • Herodotus: The History • Thucydides: History of the Peloponesian War • Pindar: great lyric poet • Sappho: great woman lyric poet • Theocritus: father of pastoral literature • Demosthenes: great orator Ancient Roman Literature • 時間 :。ancientgreekliteratue
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。