20xx年中考英语听力训练3内容摘要:

u look after the house for me while I am away? M: No problem. I hope you have a good time. W: Thanks 4. W: Look ! A lot of leaves are lying on the ground. M: The wind was very strong last night. 5. M: I want to buy some stamps and envelopes, please. W: I am sorry, but you are at the wrong window. You should buy them at window Number 3. 第二节 :听下面几段对话或独白。 每段对话或独白后有几个小题,从题中所给的 A、 B、 C三个选项中选出最佳选项,并将其标号填入题前括号内。 每段对话或独白读两遍。 听下面一段对话,回答第 6至第 8两个小题。 W: Do you remember the new movie we were talking about? M: Which one? W: The one about thirteen women and an American man in the war of Nanjing in 1937— The Flowers in the war. M: Oh, yes, now I remember. I would like to see it. W: It’s showing now at the theatre until Sunday. Do you want to go with me? M: Very much. How much does it cost? W: Sixty yuan each. M: But first I must take care of my little brother while my mother shops. After that, we can go to see the movie. W: Well, I’ll e over to your house at four o’clock on Sunday. M: Good. If I can’t go, I’ll give you a call. 听下面一段对话,回答第 9至第 10两个小题。 W: Hi, Tom. The summer vacation is ing. What would you like to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。