风险管理报告(dfmea内容摘要:

ting 2 很高 Can be detected prior to design releasing: DVR/DVL testing, animal study results and /or protocol required testing 3 高 4 中上 Can be detected prior to mass production: Process and Product Validation efforts 5 中等 6 小 Can be detected prior to shipping out the finished product: online inspections, lot release testing 7 很小 8 微小 Can be detected after shipping but prior to end user 9 很微小 Can be detected in the field but before the failure happens: IFU, Label 共 6 页第 4 页。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。