机械专业外文翻译----基于事例推理的夹具设计研究与应用(编辑修改稿)内容摘要:
ency. The methodology of case based reasoning (CBR) adapts the solution of a previously solved case to build a solution for a new problem with the following four steps: retrieve, reuse, revise, and retain [1]. This is a more useful method than the use of an expert system to simulate human thought because proposing a similar case and applying a few modifications seems to be self explanatory and more intuitive to humans .So various case based design support tools have been developed for numerous areas[24], such as in injection molding and design, architectural design, die casting die design, process planning, and also in fixture design. Sun used six digitals to pose the index code that included workpiece shape, machine portion, bushing, the 1st locating device, the 2nd locating device and clamping device[5]. But the system cannot be used for other fixture types except for drill fixtures, and cannot solve the problem of storage of the same index code that needs to be retained, which is very important in CBR[6]. 1 Construction of a Case Index and Case Library Case index The case index should be posed of all features of the workpiece, which 12 are distinguished from different fixtures. Using all of them would make the operation in convenient. Because the forms of the parts are diverse, and the technology requirements of manufacture in the enterprise also develop continuously, lots of features used as the case index will make the search rate slow, and the main feature unimportant, for the reason that the relative weight which is allotted to every feature must diminish. And on the other hand, it is hard to include all the features in the case index. Therefore, considering the practicality and the demand of rapid design, the case index includes both the major feature of the workpiece and the structure of fixture. The case index code is made up of 16 digits: 13 digits for case features and 3 digits for case identification number. The first 13 digits represent 13 features. Each digit is corresponding to an attribute of the feature, which may be one of“ *” , “。 ” , “ 1” , “ 2” ,…, “ A” ,“ B” ,…, “ Z” ,…, etc. In which, “ *” means anyone, “ ?” uncertain, “ 0” nothing. The system rules: fixture type, workpiece shape, locating model cannot be “ *”or“ ?” . When the system is designed, the attribute information of the three items does not have these options, which means the certain attribute must be selected. The last three digits are the case identification number, which means the 13 digits of the case feature are the same, and the number of these three digits is used for distinguishing them. The system also rules: “ 000” is a prototype case, which is used for retrieval, 13 and other cases are “ 001” ,“ 002” ,…, which are used for reference cases to be searched by designers. If occasionally one of them needs to be changed as the prototype case, first it must be required to apply to change the one to “ 000” , and the former is changed to referential case automatically. The construction of the case index code is shown in . Case library The case library consists of lots of predefined cases. Case representation is one of the most important issues in case based reasoning. So pounding with the index code,. Hierarchical form of Case The structure similarity of the fixture is represented as the whole fixture similarity, ponents similarity and ponent similarity. So the whole fixture case library, ponents case library, ponent case library of fixture are formed correspondingly. Usually design information of the whole fixture is posed of workpiece information and workpiece procedure information, which represent the fixture satisfying the specifically designing function demand. The whole fixture case is made up of function ponents, which are described by the function 14 ponents’ names and numbers. The ponents case represents the members. (function ponent and other structure ponents, main driven parameter, the number, and their constrain relations.) The ponent case (the lowest layer of t。机械专业外文翻译----基于事例推理的夹具设计研究与应用(编辑修改稿)
相关推荐
一定的差距和不足。 而且在实际设计中,建筑和结构化工程师很难严格按照该规范标准执行,主要因为甲方对成本和建筑布局的种种要求等原 因所致。 还有就是一些建筑和结构工程师的设计水平有限,不能很好的进行消防设计的区域划分,设计图纸的火灾区域划分不当,消防水系统设计存在错误等等。 大多数建筑消防水系统设计都存在不同程度的缺陷。 应当在后期进行及时的完善和改革。 [9] 自动喷水灭火系统应用技术发展
cisely the key factors in improving the efficiency. The methodology of case based reasoning (CBR) adapts the solution of a previously solved case to build a solution for a new problem with the
im 22lim2 计 算 及 说 明 结果 aF NFF MPS Y 2441 11lim1 aF NFF MPS Y 2041 22lim2 (一)小齿轮的转矩 IT )( .9 9 0 / 2 3 59550/9550 111 mNnPT (二) 选载荷系数 K 由原动机为电动机,工作机为带式输送机,载荷平稳
,功能满足当前和今后若干年内的发展要求等。 ( 4)落实参与改造人员和责任。 改造是一个系统工程,人员配备十分重要。 除了人员的素质条件外,根据项目的大小,合理地确定人数与分工是关键。 人员太少不利于开展工作,人员太多也容易引起混乱。 根据各个划分开的子系统,确定人员职责,有主有次,便于组织与协调。 如果项目 采用对外合作形式,更需在目标明确的前提下,界定分工,确定技术协调人。 (
nnn ; 顾客 3 的需求量的约束条件为: 3332313 nnn ; 顾客 4 的需求量的约束条件为: 3342414 nnn ; 五、模型的建立和求解 方案一: 根据上述分析,该题的数学模型为: 目标函数为: nnnmmmmmm 131211323122211211 1007521002m i n 3 nnnnnnnnn
西安工业大学毕业设计(论文) 3 粘树脂乳液及其它助剂混合制成。 这些压敏胶水乳液的涂布也是在般的涂布机生产线上进行的。 将它们涂布于基材上也要经过烘道进行干燥固化 , 将水挥发去除,然后才能将压敏胶制品进行复合和卷曲。 ( 3)溶剂型压敏胶,由各种橡胶弹性体经塑炼和混炼后与增粘树脂和其它助剂混合,并溶解在适当的有 机溶剂中制成。 溶剂型压敏胶是橡胶型压敏胶中用途和产量最大的一类。