钢材替换应用设计指南内容摘要:
tringent mass tolerance requirement. Certified Australian/New Zealand hollow sections Any bination of steel grades manufactured to: AS 11632020 • C250 (L0, L15) 7 • C275 (L0, L15) • C300 (L0, L15) • C350 (L0, L15) • C400 (L0, L15) • C450 (L0, L15) with dimensional and/or mass tolerances in accordance with: AS 11632020* NOTE * Basis for acceptance is stringent mass tolerance requirement. Certified Australian/New Zealand steel for cold forming Any bination of steel grades manufactured to: AS/NZS 15951998 • CA 220 • CA 260 • CA 350 with dimensional and/or mass tolerances in accordance with: AS/NZS 13651996* Or any bination of steel grades manufactured to: AS/NZS 13972020 • Grade 250 • Grade 300 • Grade 350 • Grade 400 • Grade 450 with dimensional and/or mass tolerances in accordance with: AS/NZS 13651996* NOTE *Basis for acceptance is stringent thickness tolerance requirement. Certified Australian/New Zealand nonpreloaded bolting assemblies Bolts manufactured to: • AS/NZS 12521996 • AS * • AS/NZS 15591997 NOTE *Grade is noncertified. Nuts manufactured to: • AS/NZS 12521996 • AS/NZS Washers manufactured to: • AS/NZS 12521996 Certified Australian/New Zealand preloaded bolting assemblies Bolts manufactured to: • AS/NZS 12521996 8 • AS Nuts manufactured to: • AS/NZS 12521996 • AS/NZS :1995 Washers manufactured to: • AS/NZS 12521996 Certified Australian/New Zealand welding consumables Welding consumables, which result in allweld metals meeting material performance requirements in , and manufactured to: • AS/NZS • AS/NZS 48552020 • AS/NZS 48572020* • AS ** • AS/NZS NOTE *Only grades 55, 62 and 69 are certified. NOTE **Z is noncertified. NOTE ***Only grades W5xxx to W6xxx are certified。 grade W5ZXH is noncertified. Certified Australian/New Zealand profiled steel sheets Any bination of steel grades manufactured to: AS/NZS 13972020 • Grade 250 • Grade 300 • Grade 350 • Grade 400 • Grade 450 • Grade 500 • Grade 550 with dimensional and/or mass tolerances in accordance with: AS/NZS 13651996* NOTE *Tolerances for coldrolled sheet/strip. Certified Australian/New Zealand shear stud connectors Stud shear connectors manufactured to: AS/NZS * NOTE *Stud diameter should be at least mm. 9 已认证中国钢材目录 已认证的中国钢板 依据相关标准生产的钢材品种 : B/T 7002020* GB/T 15911994* (已由 GB/T 15912020 代替) GB/T 41712020 (已由 GB/T 41712020《耐候结构钢》代替) GB/T 41722020 (已由 GB/T 41712020《耐候结构钢》代替) YB 41042020 (已由 GB/T 198792020《建筑结构用钢板》代替) Q235BZ ( Q295B) ( Q295GNH) Q235NHC Q235GJC Q235CZ Q345B ( Q295GNHL) Q235NHD Q235GJD Q235DTZ Q345C Q345GNH Q235NHE Q235GJE Q275BZ Q345D Q345GNHL ( Q295NHC) Q235GJZxxC** Q275CZ Q345E Q390GNH ( Q295NHD) Q235GJZxxD** Q275DTZ Q390B ( Q295NHE) Q235GJZxxE** Q390C Q355NHC Q345GJC Q390D Q355NHD Q345GJD Q390E Q355NHE Q345GJE Q420B Q460NHD Q345GJZxxC** Q420C Q460NHE Q345GJZxxD** Q420D Q345GJZxxE** Q420E Q460C Q460D Q460E 尺寸和重量允许偏差所依据的标准: GB/T 7092020* (热轧钢板和钢带的尺寸、外形、重量及允许偏差 ) A类偏差 (按公称厚度规定负偏差) B类偏差 (固定负偏差为 ) C 类偏差 (固定负偏差为零,按公称厚度规定正偏差) N 类偏差 (正偏差和负偏差相等) (普通厚度精度) (较高厚度精度) 注 : * GB/T 9121989, GB/T 32741988 作为 GB/T 7002020 和 GB/T 15911994 以及 GB/T 7092020 的参考标准,按照上述标准生产的钢板,应认为其质量是有保证的。 ** 依据 GB/T 53131985,钢板厚度方向的性能指标 Zxx是指 Z15, Z25 和 Z35。 10 已认证的中国热轧型钢 依据相关标准生产的钢材品种: GB/T 7002020* GB/T 15911994* (已由 GB/T 15912020 代替) GB/T 41712020 (已由 GB/T 41712020《耐候结构钢》代替) GB/T 41722020 (已由 GB/T 41712020《耐候结构钢》代替) 18。钢材替换应用设计指南
相关推荐
用力学求解器求得各杆件力学系数 Aa+ 93 2 026.5023.3820.6900.462+4.739+1.8840.4621.0 1.0+0.8120.5+ + + c e gB CD EF 五. 杆件截面选择 按腹杆最大内力 kNN aB 9 8)5 0 ( ,查表 钢,选中间节点板厚度为 mm10 ,支座节点板厚度为 mm12。 第 8 页 1) 上弦杆
作。 施工技术人员对技术、质量事故应能做出正确 的反映,且具备一定的事故分析处理能力,客观如实地向上一级技术负责人提供事故情况过程,负责填写事故报告。 工程结束,在项目经理、技术负责人的组织领导下编制竣工资料,编写施工竣工文件,竣工文件编制管理工作主要包括以下内容: 按合同和有关竣工资料编制要求确定竣工文件的编制内容和方法;进行竣工文件的收集、整理和编制工作;竣工资料的审核、装订和移交等。
机 械 设 计 与 制 造 技 术 的 迅 速 发 展 和 有 机 结 合 , 形 成 了 计 算 机 辅 助 设 计 与 计 算 机 辅 助 制 造 ( C A D / C A M ) 这 一 新 技 术。 C A D / C A M 是 改 造 传 统 模 具 生 产 方 式 的 关 键 技 术 , 是 一 项 高 科 技 、 高 效 益 的 系 统 工 程 , 它 以 计 算 机 软 件
客源结构:该类酒楼的客源主要由以下部分构成; ① 商务客人:外地出差到遵义的客人。 ② 本地消费:主要以公款消费和家庭性消费为主。 ③ 旅游客源:部分自驾车旅游 客人。 ④ 本地接待:遵义内的企业或个人接待外地客人。 第三部份:项目指标及评价 一 遵义川菜酒楼项目基本指标及分析 (一 ) 项目技术经济指标: 1. 建筑面积: 约 2200 ㎡ 2. 一楼面积: 约 1200 ㎡ 3. 二楼面积:
设计及规范要求。 检查数量:按不同材料进厂批次,每批次抽查 1 次; 检查方法:查检验报告、复验。 2)压实度应满足设计要求。 检查数量:每 1000m2,每压实层抽查 1 点; 检查方法:灌砂法或灌水法。 3) 7d 无侧限抗压强度应符合设计要求。 检查数量:每 2020m2 抽检 1 组( 6 块);检查方法:现场取样试验。 ( 《城镇道路工程施工与质量验收规范 》 第 ) 1)表面 应