toyota丰田3902lexusls430models(编辑修改稿)内容摘要:

n 〇 〇 〇 〇 〇 〇 Manual Close 〇 〇   〇 〇 Open 〇 〇   〇 〇 Keyoff Operation* Automatic Close ◎ ◎   ◎ ◎ Open 〇 〇 〇 〇 〇 〇 Manual Close ◎ ◎ ◎ ◎ ◎ ◎ Open 〇 〇   〇 〇 Transmitterlinked Operation Close       Open 〇 〇 〇 〇 〇 〇 Keylinked Operation Close ◎ ◎ ◎ ◎ ◎ ◎ Open 〇 〇 〇 〇 〇 〇 : Change * : Operation is permitted approximately 45 seconds after the ignition key is turned to the ACC or LOCK position, or the front doors are opened. 4. Combination Meter A speed warning system, which sounds a buzzer for 6 seconds when the vehicle speed is 120 km/h or above to ply with the regulations, has been adopted on the GS300 for the . countries. OUTLINE OF NEW FEATURES IS300/IS200 OUTLINE OF NEW FEATURES The LEXUS IS300/IS200/IS300 SportCross are a highperformance, pact FR (Front engine, Rear wheel drive) sports sedan and FR sporty 5Door. An IS200 SportCross model with the 1GFE engine, which is used on the IS300 SportCross model, has been newly added to the lineup for Europe. Furthermore, the following changes have been made to all models: 1. Model Code The IS200 SportCross (5Door) with 1GFE engine and J160 (6Speeds) manual transmission models have been added.  GXE10LAWFVKW  GXE10RAWFVKW 2. Interior  The design of the cupholder support of the center console box has been changed on the models without the LEXUS navigation system.  This cupholder support enables to adjust the installation position. With this, it deals with different size of a cup and a bottle.  On the model with the center armrest, a cupholder support has been added to the box below the center armrest.  This cupholder support is storable.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。