tisco二期扩建工程项目总承包epc合同技术附件内容摘要:
of 6500m3/h oxygen generator will be newly built, plus the existing 3200m3/h oxygen generator oxygen generator, the available oxygen amount can meet the requirements for oxygen, nitrogen and some part of argon of TISCO second stage revamping and expansion project , with extra 1600m3/h oxygen. 新建一台 6500m3/h 的制氧机,再加上原有 3200m3/h 还富余 1600m3/h氧气,能满足二期扩建项目的氧气、氮气和部分氩气的要求。 Newly built oxygen generating workshop consists of one set of 6500m3/h oxygen generator, matched utilities and auxiliary facilities, piping work in the plant, as well as bottle filling equipment system with capacity of 2020 bottles/day and night (Oxygen bottles excluded). TECHNICAL ANNEX OF EPC CONTRACT FOR TISCO SECOND STAGE EXPANSION PROJECT MCC 10 新建制氧车间包括一台 6500m3/h 的 制氧机和配套工辅设施,厂区管网 和日装瓶 2020 的 罐装设备系统。 GENERAL LAYOUT, TRANSPORTATION, UTILITIES AND AUXILIARY FACILITIES OUTSIDE SHOP 厂外总图运输和公 辅设施。 TISCO will be responsible for the construction of power supply system 110KV step down station and provide power supply source for the second stage revamping and expansion project。 the water sources for the project will be supplied by existing 70,000 m3 reservoir and water supply boosting station will be newly built. 二期扩建工程的供电系统 110kv 总变电站由 TISCO 负责承建,提供电源;扩建工程的水源是利用 TISCO 现有 70,000 m3 蓄水池的水源并新建供水站。 The main contents include the general layout, transportation, utilities and auxiliary facilities outside the main shops, such as fuel gas facilities, water supply and drainage facilities, power supply facilities, thermal power facilities, telemunication facilities etc. 主要包括内容:扩建项目的总图布置、铁路运输、道路运输及主生产车间外的燃气设施、给排水设施、供电设施、热力设施、电信设施等公辅系统。 TECHNICAL ANNEX OF EPC CONTRACT FOR TISCO SECOND STAGE EXPANSION PROJECT MCC 11 3. ADOPTED STANDARDS AND CODES FOR THE PROJECT 总图运输采用的标准和规范 (1) Design code for general layout and transportation in metallurgical enterprise (YBJ5288) 钢铁企业总图运输的设计规范 (YBJ5288) (2) Design code for industrial enterprise general plane layout (GB 5018793) 工业企业总平面设计规范 (GB 5018793) (3) Fire fighting code for architecture design (2020 version) (GBJ1687) 建筑设计防火规范( 01 年版) (GBJ1687) (4) Design code for standard rail gauge for industrial enterprise’s (GBJ1287) (5) Railway roadbed design code (TB1000199) 铁路路基设计规范 (TB1000199) (6) Road engineering technical standard (JTG B012020) 公路工程技术标准 (JTG B012020) (7) Design code for factory road (GBJ 2287) 厂矿道路设 计规范 (GBJ 2287) (8) Design code for concrete road surface (JTG D402020) 公路水泥混凝土路面设计规范 (JTG D402020) (9) Design code for high way roadbed (JTJ 01395) 公路路基设计规范 (JTJ 01395) (10) Construction technical code for concrete road surface (JTG F302020) 公路水泥混凝土路面施工技术规范 (JTG F302020) (11) Procedures for railway exploitation techniques shall be in accordance with Vietnam standards 2020. 铁路开发技术程序遵循越南 2020 年标准TECHNICAL ANNEX OF EPC CONTRACT FOR TISCO SECOND STAGE EXPANSION PROJECT MCC 12 4. DESCRIPTION OF GENERAL LAYOUT, TRANSPORTATION, ROADWAY, RAILWAY AND PIPELINE WORKS OF THE WHOLE PLAN (STAGE II) 全厂 TISCO 二期扩建工程之总图运输,公路,铁路,各种管网 的概述 GENERAL 概述 TISCO, being a important enterprise in Vietnam, was established in 1958. TISCO possesses coke making plant, sinter plant, iron making plant, steel making plant, rolling mill plant as well as corresponding utilities and auxiliary facilities etc. Its annual output of iron and steel is about 200,000t and mon carbon steel casting billet is about 250,000t. TISCO 始建于 1958 年,是越南国有重点企业。 TISCO 现有焦化、烧结、炼铁、炼钢、轧钢生产厂和相应的公辅设施等。 年生产钢、 铁约20 万吨,普碳钢连铸坯约 25 万吨。 In the plant there are railways and station yard of railway, and total railway length in the whole plant is about 60 km (including railway of mines). The railway transportation is the main transport means in the plant, plementary with roads, so the transportation in the plant is very convenience. 厂内设有铁路及铁路站场,全厂共有铁路约 60 公里(包括矿山铁路),厂内运输主要以铁路运输为主,并设有厂内道路,交通运输极为便利。 DESIGN CONTENTS 设计内容 Raw material yard, coke making plant, sinter plant, iron making plant, steel making and continuous casting plant form an plete system by themselves to produce 500,000t steel billets annually. 原料场、焦化、烧结、炼铁、炼钢及连铸,自成体系。 GENERAL LAYOUT 总图 The newly built raw material yard is located at the northwest of existing underground receiving bins of iron ore and ore powder, it occupies the place of original coal piling yard for coke making plant. The raw material yard consists of a material evenly blending yard, piling yard of ores and coal, unloading facilities for train etc. Details refer to attached drawings. 新建原料场布置在原有铁矿石、矿粉地下受料仓的西北面,占用了原有焦化煤堆场的位置。 原料场内设有混匀料场,矿、煤堆场,火车 等地下受料仓,详见附图。 Newly constructed coke oven and its utilities are located at the northeast of original coke oven, details refer to attached drawings. TECHNICAL ANNEX OF EPC CONTRACT FOR TISCO SECOND STAGE EXPANSION PROJECT MCC 13 新建焦炉及辅助设施布置在原有焦炉的东北面。 详见附图。 Newly constructed sintering machine and its utilities are located at the northeast of original sintering machine, details refer to attached drawings. 新建烧结及辅助设施布置在原有烧结的东北面。 详见附图。 Newly constructed 550m3 blast furnace is located at the northeast of original blast furnace. 新建一座 500m3 高炉布置在原有高炉的东北面。 Blast furnace auxiliary facilities include: hotblast stove, gravitation dust catcher, water granulated slag piling yard, main control room, gas cleaning system, blower station, dedusting system for casthouse, coal powder injection system, mud milling room, switchgear station, material charging system, water system ( including: circulating water pump station, suction well, cooling tower, turbid water pump station, deposition basin, pig cast machine, pig iron storage house, repairing shop of ho。tisco二期扩建工程项目总承包epc合同技术附件
相关推荐
,登录首页如下图: TestLink 使用手册 第 5 页 共 26 页 2 初始设置(设置用户、产品) 设置用户 在 TestLink 系统中, 每个用户都可以维护自己的私有信息。 admin 可以创建用 户 ,但不能看到其它用户的密码。 在 注册 用户信息中,需要设置 Email 地址,如果用户忘记了密码,可 通过 获 取密码。 TestLink 系统 提供了六种角色,分别是 Guest
.... 34 套管头规范 ......................................................................................................... 34 井口保护措施与要求 ..................................................................
右端面,粗车 Φ34mm 圆柱右凸台 , 粗车 Φ18mm 轴外圆表面,切 环 槽 查 《工艺手册》 表 628 知: 粗车 Φ34mm圆柱右凸台 的单侧余量为 ,查表 69 知: 粗车 Φ18mm轴外圆表面 的单侧余量为。 由于 Φ18mm 圆柱右端面 表面粗糙度要求为 Ra=,只需要粗加工就能保证要求,故粗车的加工余量为去除毛坯尺寸余量,即。 粗车 Φ18mm 圆柱右端面 的工序尺寸为
异 177。 % 泡罩分装 工艺参数 上加热 温度: 135℃ 下加热 温度: 135℃ 热合温度: 160℃ 压缩空气: 密封性 无渗透现象 数量 12 粒 /板 外包装 成品质量标准所有项目 各项指标应合格 验证内容 单元验证项目: 粉碎过筛 工序 工艺步骤 主要设备 批记录对应步骤 粉碎 过筛 、 称量 、 配料 40BX 型万能粉碎机、 WS515型振荡筛 诺氟沙星胶囊 粉碎 过筛
SQL 日常运维检查操作手册 操作步骤 说明 实例名 如图所示,实例名为 SQL05 实例属性: 右击实例属性 身份验证模式 : 选择“安全性”,查看服务器身份验证模式 . 帐号安全管理 检查目的: 检查数据库账户、角色是否合理和更改, 有效降低风险,明确工作职责。 操作步骤 说明 SQL 日常运维检查操作手册 操作步骤 说明 SQL 安全性 登录名 :记录登录窗口所有用户,如
4 主要施工机械设备配置 5 主要材料供应 5 八、交通安全、保通措施 5 九、质量保证措施 6 十、安全生产措施 7 十一、环境保护措施 183