ca6140机床主轴数控加工工艺及夹具设计毕业论文内容摘要:

forming machine tools, a key ponent. Axis machine tool ponents is one of the major ponents, and its performance, on the whole a great performance, cutting force under the direct axis, the speed of a large area, so the main axis of the main ponents of the proposed high performance. In the CNC machine tools, both CNC lathes, milling or drilling, the spindle is the most critical ponents of precision machine tools play a crucial role. Therefore, how to properly design and ponents for machine tool spindle machining accuracy is essential. Key words:NC machine tool。 spindle ponents。 processing accuracy 目 录 第一章 绪论 ........................................................................................................1 第二 章 车床主轴的加工工艺 .............................................................................2 车床主轴技术要求及功用 ................................................................2 主轴加工的要点与措施 ...............................................................................3 车床主轴加工定位基准的选择 .........................................................4 车床主轴主要加工表面加工工序安排 ..............................................5 谢 辞 ..............................................................................。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。