软件仓库-td-hsdpainchina内容摘要:

rollout CONTENTS DTmobile Overview; TDHSDPA Complete Solutions and Products; TDHSDPA in China DTmobile TDHSDPA Milestones。 Why to Choose TDHSDPA? • Optimally enhance the performance of TDSCDMA system • Maximally guarantee backward patibility and the scalability of system • Provide flexibility to guarantee the most efficient use of resources • ONLY need software upgrade to smoothly migrate from TDSCDMA R4 to TDHSDPA • The peak rate of TDHSDPA may reach N* (N=number of carriers) when UL/DL timeslot ratio is 1:5. The peak rate , already higher than the of WCDMAbased HSDPA, can be reached on 10MHz bandwidth. • As to WCDMA based HSDPA, if on 10 MHz, requires continuous 5MHz timeslots on UL and DL respectively, while TDHSDPA may take use of 6 separated carriers ( each). Considering the limited frequency resource, this is an obvious advantage of TDSCDMA over WCDMA. • Regarding the deployment of both R4 and HSDPA works, the narrow bandwidth based TDHSDPA has many advantages on the efficiency of resource allocation and the simplicity and flexibility of configuration over WCDMA HSDPA. What is HSUPA? – Key technologies adopted for enhanced UL performance include: • Adaptiv。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。