资讯检索策略与技巧内容摘要:

AND C (A AND B) OR (A AND C) OR (B AND C) 17 Pairwise Facets—3/3 Facet 1 Facet 2 Facet 3 Solution Set B Solution Set A Sample: A doctoral student wants a high recall bibliography prepared on the relationship between facial musculature and the physiological (autonomic) responding of emotions, ., fear. Solution Set C FINAL SOLUTION SET: A OR B OR C AND AND AND 18 Citation Pearl Growing  引用文獻滾雪球法 以 high precision 為目的  由 100%precision(相關的文章),反推追求 recall  不斷從已知相關的文獻中,獲取檢索所需的descriptors、 identifiers 、 words,重新進行檢索  適用情形 資料庫無索引典或詞彙集 新興學科  常需重複多次檢索,不適於初學者 19 Other facet strategies  Multiple Briefsearch 利用不同的 database,盡量取得 high recall  Interactive Scanning  most timeconsuming and interactive 如使用 classification codes, natural language  Implied Concepts 掌握隱含性概念,視資料庫之主題性質,選用不同詞彙 例: possible health hazards from foods cooked using microwave ovens 20 Citation indexing strategies  利用引用 (citing)與被引用 (cited)文獻之間的關係,建構檢索策略  Offer highly interdisciplinary and multidisciplinary approaches to online searching  檢索策略  Cited publication、 Cited Author、 Cocited Authors 國科會人文學研究中心人文學引用文獻資料庫( THCI) 21 Nonsubject, fact, and multiple database searching  Nonsubject searching Document type、 year of publication、 language、author、 corporate source doublelimiting  Fact searching Search for a known item  Multiple database searching 注意收錄欄位和控制語言用法 22 檢索技巧 (Heuristics)  Language Heuristics  Command Language, Database and File Structure Heuristics  Recall and Precision Heuristics Heuristics for Increasing Recall Heuristics for Increasing Precision  Personal Heuristics 23 Language Heuristics—1/2  當有下列情形,應使用自然語言檢索  One or more of the concepts of interest involves a subtle nuance of meaning  One or more of the concepts of interest is highly specific  One or more of the concepts is relatively new and appropriate terms in the controlled vocabulary don not exist  A highly prehensive search is desired (high recall) The literature to be searched is “soft” 24 Language Heuristics—2/2 當有下列情形,應使用控制詞彙檢索 The concepts of interest。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。