中国科技大学计算机科学与技术学院schoolofcomputer内容摘要:
[16]Peng Sun, Xinming Zhang, Zhenzhong Dong, Yi Zhang . A Novel Energy Efficient Wireless Sensor MAC Protocol . The 4th International Conference on Networked Computing and Advanced Information Management (NCM), September 2020. [17]Jun Lv, Xinming Zhang, Xiaojun Han . A Novel Dynamic Tuning of the Contention Window (CW) for IEEE Enhanced Distributed Control Function . The 4th International Conference on Networked Computing and Advanced Information Management (NCM), September 2020. Our Publication List on Wireless Networks(3) [18]Qiong Liu, Xinming Zhang, Yongzhen Liu, Dong Shi, Enbo Wang . Interferenceaware Probability Forwarding Mechanism for Mobile Ad hoc Networks . The 4th International Conference on Networked Computing and Advanced Information Management (NCM), September 2020. [19]Dong Shi, Xinming Zhang, Wenbo Zhu, Enbo Wang . RCDS: A Rankingbased Algorithm to Compute the Connected Dominating Set of Ad hoc Networks . The 4th International Conference on Networked Computing and Advanced Information Management (NCM), September 2020. [20]Yongzhen Liu, Xinming Zhang, Qiong Liu, Shifang Dai . Interferenceaware Physical Carrier Sensing for Maximum Throughput in Ad hoc Networks . International Conference on Communications and Networking in China (China), August 2020. [21]Wenbo Zhu, Xinming Zhang, Yongzhen Liu, Nana Li . Improve Preemptive Routing Performance in Mobile Ad hoc Networks with Cacheenabled Method . International Conference on Communications and Networking in China (China), August 2020. [22]Xiaojun Han, Xinming Zhang, Jun Lv . Optimal Rate Allocation and Power Control in Wireless Ad Hoc Networks With Random Access . International Conference on Communications and Networking in China (China), August 2020. [23]赵志伟,张信明,刘道科,阙灿 . 基于竞争允许 TDMA的无线传感器网络MAC层协议 . 计算机工程 , 2020, 33(21). Our Publication List on Wireless Networks(4) [24]Jun Lv, Xinming Zhang, Xiaojun Han, Yanyan Fu . A Novel Adaptively Dynamic Tuning of the Contention Window (CW) for Distributed Coordination Function in IEEE Ad hoc Networks . International Conference on Convergence Information Technology (ICCIT), November 2020. [25]Xinguo Wang, Xinming Zhang, Guoliang Chen, Shuang Tian . An Adaptive and Distributed Clustering Scheme。中国科技大学计算机科学与技术学院schoolofcomputer
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。